Xingtai, Hebei · Hebei industrial clusters

OEM · build-to-print · prototype to production

Send the drawing. Get a manufactured part, measured and documented.

Custom machining, forming and assembly coordinated from Hebei: CNC turning and 5-axis milling, grinding, EDM, sheet metal, castings and forgings, heat treatment, plating and anodising — with first-article inspection and a control plan that survives your audit.

critical tolerance
±0.005 mm
prototype lead time
3-10 days
minimum prototype order
1 pc
quotation + DFM
48-72 h

The process

Six steps from enquiry to container

Written out because most sourcing failures are a missing step, not a missing machine. You get the named deliverable at every stage.

  1. 01

    Requirement intake

    Send a 2D drawing with tolerances, a STEP/IGES model, a photo of the installed part, or a worn sample. Tell us quantity, application, media, temperature and what went wrong last time.

    You receive: Enquiry register entry and a named engineer within one working day.

  2. 02

    DFM review and controlled quotation

    We review manufacturability, fixture and gauge needs, heat-treatment and coating routes, then quote line by line with assumed tolerances and validity dates stated.

    You receive: Quotation + DFM report with costed alternatives, in 48-72 hours.

  3. 03

    Sample / first article

    The first article is produced on the production route and the production fixture, measured and photographed. You approve the part, not a promise.

    You receive: Signed FAI report with actual values, material certificate, sample photos.

  4. 04

    Contract, tooling and control plan

    Purchase order with agreed ship dates, tooling ownership recorded, inspection plan (characteristics, method, frequency, AQL) and sub-suppliers named in the control plan.

    You receive: Signed contract, tooling list, control plan, sub-supplier declaration.

  5. 05

    Batch production with in-process inspection

    Weekly production photos and a status line against milestones. In-process checks at rough machining, after heat treatment and after finish machining; deviations are reported to you, not quietly fixed.

    You receive: Progress report, in-process check records, pre-shipment inspection booking.

  6. 06

    Consolidation, inspection and export

    The factories on the order deliver to one agreed meeting point — the largest works on the consignment or the forwarder’s yard. There the goods are checked against the packing list, inspected to the agreed plan, repacked for the mode you chose, and documented as one shipment.

    You receive: Inspection report, packing list, invoice, certificate of origin, B/L, document pack.

Machine & process capability

What the shops we order from actually run

We quote a part only where the machine, the gauge and the process control exist. This is the working envelope we buy against.

Production capability summary
CNC turningSwiss-type Ø0.5-Ø32 mm; turning centres Ø320 × 1,000 mm, live tooling, bar feeders
CNC milling3-axis, 4-axis and 5-axis; 1,200 × 500 × 500 mm envelope, 12,000-24,000 rpm
GrindingCylindrical Ø630 × 4,000 mm, surface, centreless; internal grinding on request
EDM & wireSinker EDM and wire-cut EDM for form tooling, deep pockets and hardened parts
Sheet metalFibre laser to 25 mm, press brake to 1,100 T / 4 m, welding and finishing
Casting & forgingSand casting, investment casting, closed-die forging with machining in one flow
Heat treatmentQuench and temper, carburising, induction, nitriding — audited processors only
Surface treatmentZinc, zinc-nickel, zinc flake, hard chrome, anodise II/III, passivation, powder coat
Elastomer mouldingCompression and transfer moulding, extrusion, bonded rubber-to-metal
InspectionCMM (coordinate measuring machine), optical comparator, hardness, roughness, HTC, balancing rigs
Tolerance capabilityGeneral ±0.02 mm, critical ±0.005 mm, Ra 0.4 µm ground surfaces
Batch range1 pc prototype to 100,000 pcs per year per part number

The quotation itself

What every VeraBOM quotation contains

A quotation is the first deliverable, so it is written to be worked from. Five things are in every one — and where a small workshop cannot support the detail, the quotation says so instead of dressing the number up.

01

What we priced

The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.

02

Price, and what it covers

Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.

03

The lead time and what drives it

A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.

04

What we are unsure of — and what we would change

Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.

05

What our own paperwork covers, and who issues the rest

The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.

Priced answer within 2-3 working days for catalogue-level parts and 3-5 working days for drawing-based custom parts, after a written first reply inside 1 working day. Send a drawing →

How we run a custom programme

Three controls that keep a build-to-print order honest

Right shop, named in the file

Parts are matched to the specific machine and process, and the shop is named in the control plan. Sub-suppliers for heat treatment and plating are declared, not improvised.

Measured, not asserted

First articles and every batch come with actual values on the called-out characteristics. Where a gauge is needed, we build and calibrate it with the fixture.

Change control in writing

Drawing revisions, process changes and material substitutions are handled as documented changes with a price and schedule impact — before, not after.

OEM service questions

What is the minimum order for a custom part?

One piece for a prototype, then 50-500 pcs for a first production batch. Where a forging die, extrusion tool or mould has to be cut, we state the tooling cost separately and quote the quantity band that amortises it.

Can you work from a sample instead of a drawing?

Yes. Send the part; we measure, model and produce a drawing for your signature before any material is cut. Reverse-engineered drawings are marked as such so your records stay honest.

How fast is a quotation?

Simple parts within 2-3 working days; assemblies with heat treatment, plating and inspection requirements in 3-5 working days, including the DFM report and a schedule.

Who owns the tooling, fixtures and CNC programmes?

You do, once paid for. They are listed in the contract, marked with your part number, stored and maintained by us, and released to you or another supplier on request.

Do you sign an NDA before we send drawings?

Yes — send us your own form or use ours. Drawings live in an access-controlled project folder and are shared only with the shop producing the part.

Can you assemble and kit, not just machine?

Yes. Machined parts, shafts, seals, bearings, fasteners, cables and cartons can be kitted into assemblies with a bill-of-materials packing list, so your line receives ready-to-build sets.

Written first reply within 1 working day; priced answer within 2-5 working days.

Quote my part

Prototype, short-run or annual programme — send the drawing and we return a controlled quotation with the process route, inspection plan and schedule.