Xingtai, Hebei · Hebei industrial clusters

Quality & inspection

Every shipment is measured before it is paid for in full

The commercial structure is the quality control: 50% deposit, production, inspection, measured results in your inbox, then the balance. If the numbers do not match the approved first article, the goods do not move.

Standard package

  • AQL 2.5 general inspection — AQL 1.0 on safety-critical items
  • EN 10204 3.1 material certificates per heat
  • Functional test records (pressure, balance, torque, load, hi-pot)
  • Photographs of parts, packing and container loading
  • Retained sample and approved first article on file
  • Written corrective action within 5 working days of a claim

Take the checklist with you (CSV) — one row per gate, with the record to ask for and the way to verify that record rather than trust it.

Process

Three inspection gates and one corrective-action loop

Each gate has an owner, a record and a consequence. A gate that fails stops the order — that is the whole point of having gates.

IQC

Incoming quality control

Material grade, dimensions of blanks, certificate match against heat marks, plating and coating thickness of purchased components. Non-conforming stock is quarantined at the factory, not at your warehouse.

Records produced

  • Material certificate 3.1
  • Blank dimensional check
  • Heat-number log
IPQC

In-process quality control

First-off approval at each operation, then patrol checks at the frequency in the control plan. Critical features are measured after heat treatment and again after finish machining, because that is where parts move.

Records produced

  • First-off record
  • Patrol check sheet
  • Hardness and thickness checks
FQC

Final inspection before packing

AQL 2.5 general inspection (AQL 1.0 on safety-critical and load-bearing items) with functional testing where the product demands it — pressure, leakage, runout, balance, torque, cycle count.

Records produced

  • AQL inspection report
  • Functional test records
  • Packing verification photos
CAPA

Corrective action and containment

Any confirmed non-conformity triggers containment, root-cause analysis, a corrective action with an owner and a date, and a re-validated first article before the next batch ships.

Records produced

  • 8D / corrective-action report
  • Re-validation FAI
  • Updated control plan

Testing capability

What gets tested, and to which standard

Run on the maker's own test equipment where the standard calls for it, or on an independent laboratory you commission and we price in — the standard clause appears on the report.

Common tests by category
Tensile, yield and elongationISO 6892-1 / ASTM A370
Impact (Charpy V)ISO 148-1
Hardness HRC / HV / HBISO 6508, ISO 6507
Case depth of carburised partsISO 14324
Dimensional inspection on CMMISO 1101 GD&T interpretation
Surface roughness and profileISO 4287 / 4288
Pressure and leakage proof test1.5× rated, hold time recorded
Salt-spray corrosionISO 9227 NSS, 72-1,000 h
Coating thicknessISO 19880 / magnetic & destructive
Dynamic balancingISO 21940, G2.5 - G6.3
Ultrasonic / magnetic particle NDTISO 17640, ISO 9934
Spring load-at-length and fatigueEN 15800 Class I/II
Board burst, ECT and drop testISO 2759, ISO 12199, ISTA 1A/3A
Cable resistance and hi-potIEC 60228, IEC 60245

Traceability

What your quality department receives

A document pack that lets you close an incoming-inspection report without a phone call to China.

Per shipment

  • Inspection report with actual measured values, not ticks
  • Photographs of the parts, the marks and the packed container
  • Certificate pack matched to heat and batch numbers
  • Packing list with carton marks and batch references
  • Functional test records per unit where applicable

Per programme

  • Approved first article, signed and dated
  • Control plan and process flow, with sub-suppliers named
  • Gauge and fixture list held against your part numbers
  • Corrective-action history with verified effectiveness
  • Annual re-audit record for each producing shop

First-order terms

What we put in writing so a first order is not a leap of faith

Buying from a supplier you have never met is the expensive part. These are the concrete commitments that move risk off you before the first container — each one an action, not an adjective. None of them rest on a history we do not have.

01

Hold a sample before you commit

Sample cost and outbound freight are on the buyer; on standard items the sample charge is credited against your first production order. You approve a measured part, not a description of one.

02

Bring your own inspector

Appoint SGS, Bureau Veritas, Intertek or an agency you already trust, at your cost. We book the slot, escort the inspector on the shop floor and hand you the original report — not a summary of it.

03

A stated minimum, not an invented one

MOQ is printed per item. A first trial order below MOQ is accepted with a transparent small-lot surcharge quoted before you commit, so a pilot purchase never turns into a renegotiation.

04

Payment released by evidence

A 50% deposit starts production; the balance falls due once you have approved the inspection report and photo pack, and before the container is loaded. We do not open letters of credit at present, and we never take payment into a personal account.

05

A photo pack and a packing video before the doors close

Before the balance and before loading you receive the pre-shipment inspection photos and a packing video: cartons weighed, marked and counted line by line against the packing list.

06

Transit damage has a defined route

CIF shipments move with marine insurance. Photograph the outer cartons before you break the seals, send the images with the batch reference, and a documented claim receives a written answer on the case within five working days.

07

Fix it before it ships, not after

If a batch fails inspection we sort, rework or remake at our cost before the container is closed. A pre-shipment correction is cheaper for both of us than a claim argued across eight time zones.

08

Company account, always

Payment goes to a corporate bank account in the registered company name. We do not receive order money into personal accounts — full stop — so your audit trail and ours both hold.

The honest filter

The orders we turn down — and why

A supplier who will not tell you what he refuses will not tell you why your goods are late either. These are the enquiries we decline on principle, said plainly, before they become your problem.

  • Counterfeits, replicas and borderline IP

    Nothing dressed to look like a branded part. Goods seized at customs cost you the shipment and us the export licence, and no order value justifies that risk.

  • A request to under-declare the invoice

    A cheaper customs bill is tax fraud in your country. We will not put a false value on a document that travels with your goods and lands in your name.

  • A "copy that other sample" order with no drawing or standard

    Without a specification there is nothing to inspect against, so neither of us can prove the part is right. Send a drawing or a standard and we will quote it honestly.

  • Payment into a personal bank account

    It removes your audit trail and ours. We are paid company to company, or we do not take the order.

  • Borrowed or shared certificates

    A certificate not traceable to your heat, batch or model is not evidence — it is exposure for both sides. We state the real certificate we hold and its number, or say plainly that we do not have one.

  • Long-haul LCL lots where freight outweighs the goods

    When shipping costs more than the parts, an honest price loses to a supplier who will lie about the value. We would rather tell you the math does not work than quote a number we cannot hold.

Documents, not certificates

We hold no product certificates — here is what we hold instead

Product certificates are issued to manufacturers, not to buyers' agents, and any trading company that says otherwise is selling you a piece of paper. What we can do is narrower and more useful: name the document your market actually requires, get it from the party entitled to issue it, verify it before the goods move, and decline the order when it cannot be produced.

Three things commonly called a certificate, who is entitled to issue each, and our role
What buyers ask forWhat it actually isWho may issue itOur role
CE certificateFor most of what we supply: a manufacturer’s declaration of conformity plus a technical file. Some product families need a notified body’s involvement; a few need type examination.The manufacturer (or its authorised representative in the EU for some schemes)We request it, read it, and check the scope covers your model — we never issue it or translate it into a claim
Material certificateEN 10204 type 2.1 / 2.2 / 3.1 documentation of chemistry and mechanical results against a heat or batch numberThe steel mill, the foundry, or the maker's own laboratory (3.1 requires an independent-from-production signatory)We specify the type on the quotation, collect it per heat, and match numbers to the marking on the goods
Test reportResults of specific tests on a sample or a batch — dimensional, hydrostatic, salt-spray, tensile, coating thicknessAn in-house lab, an independent laboratory, or an inspection bodyWe can commission it on your order when your application depends on the result, quoted before you commit, and we send the raw values rather than a summary
ISO 9001 certificateA quality-management-system certificate for one factory’s site and scope. It says the firm has a documented management system; it says nothing about whether a specific part meets your drawing or your specificationThe manufacturing factory, certified by an accredited certification body — it is never issued to a trading company in place of the factory's ownWe check that the certificate covering your supplier is current and that its stated scope includes the process you are buying, and we tell you when it does not

Option 1

Commission the test

Where no current report exists and your application depends on the result, we can commission third-party laboratory testing against your order. Cost and turnaround are quoted before you commit, and the report is issued to you — reusable on later orders for the same specification.

Option 2

Change the specification

Sometimes an adjacent size, grade or class already has a current report behind it. Where moving your specification to that point is cheaper and faster than waiting for a test, we say so in the quotation and show you the report before you agree.

Option 3

Decline the order

If neither route works — no report can be produced for what you need, at a cost and lead time you would accept — we say the order is not ours, rather than taking payment and leaving you to wait on a document that may never arrive.

We hold no product certificates — no trading company does, because those certificates are issued to manufacturers, not to buyers' agents. What we do instead is narrower and more useful: we tell you which document your market actually requires, get it from the party entitled to issue it, check it before the goods move, and decline the order when it cannot be produced.

What we will not do with paperwork

  • We do not supply a certificate we cannot trace to an issuer you can contact.
  • We do not borrow a factory's certificate for a factory that does not hold it, and we do not accept a certificate whose scope does not name your product.
  • We do not declare a conformity mark that the goods do not carry, and we do not remove one that they do.
  • We do not under-declare invoice value, split a shipment to dodge a threshold, or describe goods in a way that avoids a licence.
  • We do not quote against a certification we cannot obtain in the lead time we gave you — we say the order is not ours instead.

Check us yourself

You do not need to take any of this on our word. Every document below has a place where you can verify it without asking us.

EU declaration of conformity
The issuer’s name, the exact model and the harmonised standards listed must all match your order; the notified body number (four digits, next to the CE mark) can be looked up against the EU list of notified bodies
EN 10204 2.x / 3.1 material certificate
The heat number on the certificate must be the heat number marked on the goods — check this first, it catches most paper problems
Third-party laboratory report
The report number and the laboratory’s own site; ask for the raw data page, not only the certificate sheet
EAC / TR CU conformity document
The public registry of the issuing union; the holder’s name must be the manufacturer or your declared importer, not a stranger
Certificate of origin / Form E / Form A
Issued by the council or customs authority named on the document; the number is checkable with the issuer
Inspection body (SGS, Bureau Veritas, Intertek or an agency you appoint)
Verify the report reference with the body directly — we will not object, and we keep the sampling records so a second opinion has something to work from

Inspection and documentation questions

Who inspects, and are they independent of the factory?

Our own engineers inspect at the factory and again at the loading before the container is sealed. You are welcome to appoint SGS, BV, Intertek or your own agent in parallel; we send the inspection booking in advance so nobody is surprised.

What happens when something fails inspection?

The batch is held. You receive the measurements and photographs, and we present two options with prices: sort/rework at the factory cost, or remake with a revised schedule. Nothing ships "mostly okay".

Can you test to our standard rather than a Chinese GB standard?

Yes. Specify ISO, EN, ASTM, DIN, JIS or AASHTO at enquiry and the test protocol is written to that standard, with the clause number on the report.

Do you keep retained samples?

For each production batch we keep a retained sample and the approved first article for the retention period stated with your order, so a later claim can be measured against the same reference rather than argued from memory.

How is traceability maintained across a mixed container?

Heat numbers and batch codes are marked on the parts where geometry allows, recorded on the packing list, and mapped to the certificate pack. Carton marks carry the item code and batch reference.

Written first reply within 1 working day; priced answer within 2-5 working days.

Judge us on the inspection report, not the brochure

Ask for a sample document pack with your quotation and compare it line by line with any other supplier's.