Xingtai, Hebei · Hebei industrial clusters

Cangzhou / Renqiu roadside and civic fabrication cluster

Civic steelwork that survives its first winter — bins, benches, shelters, bollards, tree grates and planters built to a coating thickness and a container plan

Street furniture fails in the first two winters, and almost always for the same reason: the coating was specified as a colour rather than as a system. A bench or a bin standing outside is carrying salt, grit, bicycle racks, cigarette burns and pressure washers, and the item that survives is the one where the steel was prepared, hot-dip galvanised to a thickness appropriate to its section, then powder-coated over the zinc with the adhesion preparation done properly. We state the galvanising thickness band per wall thickness, the powder system and the measured coating readings from the lot, so a specification can be compared with another quotation instead of both being described as galvanised.

This work comes out of the Cangzhou and Renqiu roadside and civic fabrication belt, the same suppliers that roll and galvanise guardrail, posts and highway steelwork for Hebei road projects. That matters for two practical reasons: the galvanising kettle, the powder line and the laser and press work are already there, and project batching — a scheme delivered in stages, in colours matched across item types, packed by site rather than by product — is normal working practice for these shops rather than a special favour for an export buyer.

The other half of a civic order is logistics and repairability, and both are decided before production. Flat-pack versus welded assembly changes your container count, your freight cost per item and who bolts it together on site, so we quote the loading plan with the price: items per twenty-foot and per forty-foot high-cube, base flanges and anchor patterns drawn, and the fixing interface stated rather than discovered. Liners, ash trays, slats, locks and poster fittings are quoted as a consumable line with the scheme, because the range a municipality can keep in stock and repair is the range that gets re-ordered.

Production capability

Street Furniture Manufacturer & Factory Direct — what we actually build

These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.

Street Furniture capability
Item familiesLitter bins, park benches, bus shelters, bollards, tree grating and guards, planters, liners and insert consumables
SubstrateQ235B / S355 plate and section, 1.5 - 3 mm sheet work, galvanised tube sections, cast-style steel decorative parts
Corrosion systemHot-dip galvanising to the thickness band for the section, or zinc-rich primer system where geometry makes hinging impractical
Top finishPolyester powder coat 60 - 120 µm over prepared galvanising, RAL or your colour, wood-grain and anti-graffiti options
Timber and slatsSawn hardwood or WPC slats, kiln-dried or capped, species and moisture content declared per order with an oil or lacquer finish
Glazing and panelsToughened glass 5 - 8 mm or PETG option, poster cassette and advertising frame sizes stated, anti-vandal film available
Cutting and formingLaser and plasma profiling, press-broken sheet, rolled sections, perforated and punched decorative patterns to your drawing
Structural basisShelter and post frames built to a stated wind and roof load band with the anchor bolt pattern and base flange drawn
Loading planFlat-pack or assembled counts per 20 ft and 40 ft high-cube quoted with weight, stack height and pallet configuration
RepairabilityReplaceable slats, liners, ash trays, locks, hinges, glazing beads and poster fittings listed as a stocking line

Materials we quote as standard

  • Q235B / S355 structural steel
  • Hot-dip galvanised tube and section
  • Polyester powder coat over prepared zinc
  • Hardwood or WPC slats
  • Toughened glass and PETG panels
  • HDPE and galvanised liners

Typical applications

  • Municipal street, park and waterfront schemes
  • Bus stops, cycle infrastructure and transit interchanges
  • Shopping precincts, campuses and business parks
  • Housing, industrial estate and landscape contractor projects
  • Hotel, marina and public-realm developments

Industries served & customs codes

Industries
Municipal & civic works, Parks & landscaping, Public transport infrastructure, Contractor & project supply, Retail & campus estates
Common HS codes
7326.9090 / 7308.9000 / 9401.8090 / 9406.9090
Listed items
8 documented specification sheets

Definition

Street Furniture: the three call-outs that decide acceptance

Street furniture is a durability specification: material, coating system and fixing method decide how it survives weather and public use.

Street furniture is quoted as a coated system — Q235B/S355 substrate, hot-dip galvanising or zinc-rich primer, 60–120 µm polyester powder over it — at 20–100 sets per item type, with a sample or mock-up in 10–18 days and production 25–45 days from approved drawings, staged by site when the project needs it.

Numbers a buyer can quote

Item families
Litter bins, park benches, bus shelters, bollards, tree grating and guards, planters, liners and insert consumables
Substrate
Q235B / S355 plate and section, 1.5 - 3 mm sheet work, galvanised tube sections, cast-style steel decorative parts
Corrosion system
Hot-dip galvanising to the thickness band for the section, or zinc-rich primer system where geometry makes hinging impractical
Top finish
Polyester powder coat 60 - 120 µm over prepared galvanising, RAL or your colour, wood-grain and anti-graffiti options
Timber and slats
Sawn hardwood or WPC slats, kiln-dried or capped, species and moisture content declared per order with an oil or lacquer finish
Glazing and panels
Toughened glass 5 - 8 mm or PETG option, poster cassette and advertising frame sizes stated, anti-vandal film available
Cutting and forming
Laser and plasma profiling, press-broken sheet, rolled sections, perforated and punched decorative patterns to your drawing
Lead time
Sample or mock-up 10-18 days; production 25-45 days from approved drawings, staged by site where the project requires it

How an order runs

How to run an order on Street Furniture: six steps from enquiry to container

The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.

Specifications last reviewed — the newest product sheet in this category.

The six steps

  1. 1

    Step 1 · Enquiry

    Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.

  2. 2

    Step 2 · Written first reply

    Within 1 working day of the enquiry reaching us.

  3. 3

    Step 3 · Priced answer

    Within 2-5 working days: price per line, lead time, factory route and inspection plan.

  4. 4

    Step 4 · Sample or first article

    Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.

  5. 5

    Step 5 · Pre-shipment inspection

    AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.

  6. 6

    Step 6 · Balance and loading

    Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.

Why this category through us

The three things that decide whether a category is worth importing

Zinc thickness stated per section

Galvanising thickness depends on material thickness, and a fabricated item made from thin sheet cannot carry the same coating as a 10 mm plate. We state the band we are aiming at for each section and record measured readings from the lot.

Quoted with a loading plan

Flat-pack or assembled, items per container, stack heights and the site fixing arrangement are part of the quotation, because a civic order priced without freight is a price that will be revised.

The consumable line keeps the scheme alive

Liners, ash trays, slats, locks and glazing beads are listed by part for every item we ship, so a broken bench becomes a replacement slat rather than a removed bench, and your maintenance budget stays predictable.

Documented specifications

Street Furniture: listed product sheets

Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.

Street Furniture: buyer questions

Galvanised, powder-coated, or both?

Both, and the order is galvanise first then coat over properly prepared zinc. Powder alone over blast-cleaned steel will lift at a scratch and run rust underneath it in a salted or coastal environment; galvanising alone is grey and will chalk. The zinc is the corrosion allowance and the powder is the colour and the UV layer, so we specify the thickness band for each section and the powder system over it.

Do these meet EN 1176 or a security rating?

Not as stated, and we would rather say so than let you find out in a tender query. EN 1176 covers playground equipment, not a bench or a bin, so we do not claim it against street furniture items. What we do specify is the corrosion system with measured coating thickness, the structural steel grade and the weld and anchor arrangement. Where a project needs an impact or vehicle-security duty, that is a different build with its own tested arrangement, quoted as such rather than implied by a bollard photograph.

Should we buy flat-packed or assembled?

Flat-pack gives a much better container count and lower freight per item, and most civic items are bolt-together by design with a socket wrench and two people. Assembled suits heavy shelter frames where site labour is expensive or where the welding was done as one piece. We quote both with the per-container figures so the difference is arithmetic.

How is installation handled for a contractor abroad?

Base flanges and anchor bolt patterns are packed with the frame; a setting-out drawing and the template or a drilled pattern are prepared per order and quoted with it, so the concrete pad can be prepared to the right centres. Ground anchors, expansion sets and a fixing kit are quoted per item type, and a stamped pad drawing is the cheapest thing in the whole order.

What should a municipality keep in stock?

Liners and ash trays for the bins, a slat allowance per bench type, lock and hinge sets, glazing beads and poster fittings. We list the part numbers against each item we ship and quote a first-stock allowance with the order, which is what makes a public-realm range repairable rather than disposable.

Inside the quotation — what comes back, and in what order
  • What we priced

    The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.

  • Price, and what it covers

    Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.

  • The lead time and what drives it

    A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.

  • What we are unsure of — and what we would change

    Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.

  • What our own paperwork covers, and who issues the rest

    The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.

Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.

Send the drawing here — name, email, what you need

Request for quotation

Tell us what you need made or sourced

Send drawings, a photo or just a part name — we reply within 1 working day.

Only your name, your e-mail and the requirement — typed or recorded — are needed to send. Leave anything else blank and it comes back as a question in our reply instead of stopping you here.

Name, company and e-mail are the only required fields — nothing else blocks the enquiry.

Drawings are treated as confidential — tell us if you need an NDA first, and we will send one before you attach anything.

PDF, DWG, DXF, STEP, IGES, SLT, Office, CSV, PNG, JPG, ZIP or an audio recording — up to 4 files, 10 MB each.

We log the file list with your enquiry; the files themselves travel to the sales desk as mail attachments, not into a database record. Bigger than this? Send quote@verabom.com a link and we will pick it up.

By sending this form you agree we may contact you about this enquiry. We never resell your data — see our privacy policy.

Written first reply within 1 working day; priced answer within 2-5 working days.

Get a street furniture quotation in 2-5 working days

Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for street furniture.