Logistics & commercial terms
Freight, payment and paperwork — stated before you order
Industrial parts are cheap to make and expensive to get wrong in transit. This page sets out the terms we actually trade on, so your landed-cost model does not have to guess.
Delivery terms
Incoterms we trade on
Every quotation states the term and what it includes. If a price looks unusually low, check this table first.
| EXW | Pickup from the producing factory; best when your own forwarder consolidates in China. |
|---|---|
| FOB Tianjin | Standard for Hebei cargo — inland to port, customs clearance and loading on our account. |
| FOB Qingdao / Shanghai | Used where vessel service or consolidation works better for your destination. |
| CIF / CFR | Ocean freight and insurance to your discharge port; we advise transit time and carrier class. |
| Air express | DHL / FedEx / UPS for prototypes and urgent replacement parts under roughly 300 kg. |
Typical ocean transit from China
- North America West Coast
- 14 - 20 days ocean · 1-2 days inland to port
- North America East Coast
- 30 - 38 days ocean (Panama or Suez routing)
- North Europe (Hamburg, Rotterdam, Felixstowe)
- 32 - 40 days ocean
- Mediterranean
- 28 - 34 days ocean
- Middle East (Jebel Ali, Dammam, Jeddah)
- 18 - 26 days ocean
- South America East Coast
- 35 - 45 days ocean
- Pacific / Central America
- 28 - 40 days ocean
- Southern Africa
- 26 - 34 days ocean
- South-East Asia
- 6 - 14 days ocean
Payment
How money moves on an export order
The payment schedule is also the quality gate: the balance follows the inspection report.
| T/T 50% + balance | New accounts: 50% deposit starts production; the balance is settled in full before the container is loaded. |
|---|---|
| No L/C at present | We do not transact on letters of credit yet — stated plainly so your finance team is not planning around it. |
| The trigger, not the percentage | The balance falls due after you approve the inspection report and photographs — the measurement releases the payment, then we load. |
| Corporate account only | Every invoice names the same legal entity and bank account. We never take payment into a personal account, and we will not split it across names. |
| Open credit | Considered after 12 months of order history, reviewed annually with volume and payment record. |
| Price validity | Metal and cable quotations are tied to a stated index basis and a validity window of 7-30 days. |
Lead times
Standard items 15–25 days after deposit. Custom/OEM parts 25–45 days including first-article approval. Large machined assemblies 35–60 days.
Production time is quoted per item on the category and product pages, and the order confirmation carries the milestone dates (material, first article, batch completion, inspection, shipment).
Packing & documentation
What protects the goods, and what proves them
Packing is engineered per product family, and the document pack is assembled as part of production rather than improvised at the port.
Packing options
| Export carton | Double-wall BC board, banding and corner boards for items under 30 kg. |
|---|---|
| Plywood case | Fumigated, ISPM-15 stamped, with internal cradles for machined surfaces. |
| Steel pallet / skid | Welded frames with lashing points for rotors, cylinders and modules. |
| VCI and desiccant | Corrosion protection for shipped-steel and machined faces on 30-45 day transits. |
| Container plan | Loading diagram issued before production ends so bracing is not improvised. |
Standard document pack
- Commercial invoice and packing list (item level, with carton marks)
- Bill of lading or air waybill
- Certificate of Origin (CO / Form E where applicable)
- EN 10204 3.1 material certificates and heat-number log
- Dimensional, hardness and functional test reports
- AQL pre-shipment inspection report with photographs
- Fumigation certificate for timber packing (ISPM 15)
- Insurance certificate for CIF shipments
- Dangerous-goods documents for batteries and aerosols
Certificates, test reports and inspection records are supplied in English as PDF with the shipment, and can be emailed as drafts before the balance payment.
Clearing the goods is your side of the line, so start it with our HS code list by category (CSV) — the codes we commonly declare, matched to the Hebei belt each category is sourced from.
Shipping and payment questions
Do you quote door-to-door?
No. We quote CIF or CFR to your discharge port, or FOB / FCA at the port, and the goods are cleared by your own broker — the import entry is filed in your name and the duty sits on your own papers, which is also how you can audit the landed cost line by line.
When exactly is the balance due?
After the inspection report and measured records are in your inbox, before the container is sealed. That sequence is deliberate: you approve the goods, then the second payment goes out.
Can you hold cargo while we arrange a second supplier?
Yes, when the schedule needs it — storage is a forwarder service, so we quote it as a separate line rather than folding a charge into your unit price. What usually aligns a mixed container is scheduling: the last factory’s production start is set once the earlier goods have passed inspection, so everything lands in one container on one date.
Do you handle dangerous goods, such as e-bike batteries?
We ship them with proper UN packaging, the UN38.3 test summary and MSDS, declared as per the carrier schedule. Battery packaging and declaration costs are quoted as a separate line, never hidden.
Who pays for a delayed vessel?
Nobody can control a carrier, so we do not promise what we cannot deliver: we state the schedule band at quotation, book with named carriers, and give you the tracking reference at departure.
Written first reply within 1 working day; priced answer within 2-5 working days.
Send your destination and quantities — we price the whole route
Tell us the port or door address and the annual volume and we will quote freight options side by side with the lead time each one implies.