The die is yours, and the order says so
Tooling ownership, where the die is stored, and what a transfer costs are written into the order. A powder metal part with a hostage tool is not a supply relationship.
Xingtai, Hebei · Hebei industrial clusters · Written first reply within 1 working day; priced answer within 2-5 working days.
Wuan (Handan) iron-powder materials cluster
A powder metal part is a tooling decision first: the die buys the geometry, so the price belongs to a volume band. Send the drawing with the annual quantity and we quote the tool, the part at your band, and what the process can and cannot hold without a secondary operation.
The Handan iron-powder works in this directory press and sinter gears and structural parts, with sizing, heat treatment and infiltration as separate named steps — so the material call and the accuracy call can be argued independently instead of being sold as one black box.
Production capability
These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.
| Part families | Spur and helical gears, sprockets, bushings, cam and clutch hubs, structural shapes |
|---|---|
| Compaction | Press tonnage matched to projected part area; the limit is stated with the tool quote |
| Grades | Iron-copper-carbon, prealloyed and diffusion-alloyed powders, copper-infiltrated where the duty needs it |
| Density | Sintered density class named per grade; partial density flagged where a feature requires it |
| Tolerances | As-sintered, sized and machined classes quoted separately — the class decides the price |
| Post-processing | Steam treatment, carburising or carbonitriding, heat treatment, plating and painting |
| Tooling | Die ownership recorded in your name, with storage and transfer terms written into the order |
| Tooth quality | Accuracy class stated; quieter running than a cut gear is not claimed as a default |
| Inspection | Density, tooth check and dimensional report per lot, traceable to press and sinter batch |
| Prototype route | Machined samples before the die, priced separately from the powder metal part |
Definition
A powder-metal part is pressed, not cut: metal powder is compacted in a die to near-net shape and then sintered so the particles bond, which is why density and the sintering class decide strength and running noise as much as the tooth profile does.
PM parts are priced in volume bands that start from the tool: below the die amortisation a cut gear is the honest answer, tooth accuracy is stated as a class, and quieter running than a cut gear is not claimed by default.
How an order runs
The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.
Specifications last reviewed — the newest product sheet in this category.
Step 1 · Enquiry
Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.
Step 2 · Written first reply
Within 1 working day of the enquiry reaching us.
Step 3 · Priced answer
Within 2-5 working days: price per line, lead time, factory route and inspection plan.
Step 4 · Sample or first article
Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.
Step 5 · Pre-shipment inspection
AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.
Step 6 · Balance and loading
Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.
Why this category through us
Tooling ownership, where the die is stored, and what a transfer costs are written into the order. A powder metal part with a hostage tool is not a supply relationship.
Sizing and machining cost more than sintering alone. We quote as-sintered, sized and machined as three numbers, so you buy the accuracy the assembly needs rather than the one the brochure advertises.
A sintered gear runs differently from a ground one. Where the duty needs quiet, high-torque running, we name which extra step gets you there and what it costs, instead of promising both.
Documented specifications
Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.
PM Gears
Powder metallurgy spur gear pressed and sintered to your drawing, quoted with density, tolerance class and the tool cost separated from the part price.
PM Gears
Self-lubricating sintered bearings, sprockets, cams, flanges and other structural parts pressed and sintered from iron- or copper-base powders to your drawing, with density and oil content named on the offer.
It depends on the part, so the honest test is amortisation: we quote the tool separately and show the part price at your annual volume, which lets you see where the die pays for itself against a cut gear.
Close in dimension, often not in noise. Sintered teeth differ in profile and surface; if the assembly is noise-sensitive we name which step closes the gap — sizing, profile grinding or a different tooth form — and what it costs.
Yes, with ownership recorded in your name, storage terms and a defined cost and lead time to transfer it. Tool condition is photographed at each release so a wear dispute has a record behind it.
Common iron-based grades including iron-copper-carbon, prealloyed and diffusion-alloyed powders, plus copper-infiltrated and stainless classes. The drawing and the duty decide which one we quote; density and tolerance class are named on the offer.
Usually — the same region cuts gears, shafts and machined pinions. A gearbox set quoted across two processes is normal here, and we state which part comes from which process so the cost drivers stay visible.
What we priced
The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.
Price, and what it covers
Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.
The lead time and what drives it
A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.
What we are unsure of — and what we would change
Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.
What our own paperwork covers, and who issues the rest
The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.
Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.
Written first reply within 1 working day; priced answer within 2-5 working days.
Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for pm gears.