Xingtai, Hebei · Hebei industrial clusters

Hengshui / Xingtai moulding cluster

Moulded rubber and plastic parts: seals, bushings, profiles, casters

Moulded elastomer parts look simple and fail in subtle ways: wrong compound, under-cure, flash on a sealing face. We specify compound by formulation and hardness, confirm cure samples, and control flash and dimensions with an inspection plan agreed before the first shot.

Tooling and moulding sit close together in the Hengshui and Xingtai areas, so a mould modification takes days rather than weeks.

Verified facts on Rubber & Plastic

  • Moulded parts Shore A 20–95 held to ISO 3302-1 Class M2/M3, with compounds named by formulation and hardness rather than by colour.
  • We answer every RFQ with a written first reply within 1 working day and a priced quotation within 2-5 working days, and the AQL 2.5 pre-shipment inspection report travels in the crate as an original; EN 10204 3.1 material certificates accompany the categories that call for them.
  • Compounds are batch-mixed by partner moulders to formulation and moulds are cut by audited tool rooms; we inspect cure and flash but do not claim one branded rubber factory.

Production capability

Rubber & Plastic Parts Manufacturer & Factory Direct — what we actually build

These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.

Rubber & Plastic Parts capability
ProcessesCompression & transfer moulding, extrusion, injection moulding, PU casting
Part weight0.5 g - 15 kg
HardnessShore A 20 - 95, Shore D, 85A-75D PU
CompoundsNR, SBR, NBR, HNBR, EPDM, silicone VMQ, FKM, CR, PU
PlasticsPA6/PA66+GF, POM, PP, ABS, PC, TPE/TPU
ToleranceISO 3302-1 Class M2/M3; plastic to ±0.05 mm
ReinforcementFabric, metal inserts, bonded-to-steel, spring cores
ToolingSingle and multi-cavity moulds, 2-4 weeks lead time
TestingHardness, tensile, elongation, ageing, salt spray, compression set
DocumentationRoHS / REACH statements and food-contact (EU 10/2011) declarations on selected compounds

Materials we quote as standard

  • EPDM
  • NBR / HNBR
  • FKM fluoroelastomer
  • Silicone VMQ
  • Natural rubber
  • PU
  • PA66-GF
  • POM

Typical applications

  • Gaskets, O-rings and hydraulic dust seals
  • Engine and chassis mounts, bushings
  • Anti-vibration pads and feet
  • Hoses, bellows, profiles and window seals

Industries served & customs codes

Industries
Automotive, Hydraulics, Construction equipment, Appliances, Rail & mass transit
Common HS codes
4016.9300 / 4016.9990 / 3926.9097
Listed items
10 documented specification sheets

Definition

Rubber & Plastic: the three call-outs that decide acceptance

Rubber and plastic parts are compound-first parts: the polymer and hardness set the feel and the chemical resistance, and the tool or cut path sets a repeatable shape.

Rubber and plastic parts are quoted by compound and hardness — NR to FKM, Shore A 20–95, 0.5 g to 15 kg — at 500–3,000 pcs per part number or 50–200 pcs for moulded prototypes, with tooling in 2–4 weeks and production 15–30 days after sample approval.

Numbers a buyer can quote

Processes
Compression & transfer moulding, extrusion, injection moulding, PU casting
Part weight
0.5 g - 15 kg
Hardness
Shore A 20 - 95, Shore D, 85A-75D PU
Compounds
NR, SBR, NBR, HNBR, EPDM, silicone VMQ, FKM, CR, PU
Plastics
PA6/PA66+GF, POM, PP, ABS, PC, TPE/TPU
Tolerance
ISO 3302-1 Class M2/M3; plastic to ±0.05 mm
Reinforcement
Fabric, metal inserts, bonded-to-steel, spring cores
Lead time
Tooling 2-4 weeks; production 15-30 days after sample approval

How an order runs

How to run an order on Rubber & Plastic: six steps from enquiry to container

The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.

Specifications last reviewed — the newest product sheet in this category.

The six steps

  1. 1

    Step 1 · Enquiry

    Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.

  2. 2

    Step 2 · Written first reply

    Within 1 working day of the enquiry reaching us.

  3. 3

    Step 3 · Priced answer

    Within 2-5 working days: price per line, lead time, factory route and inspection plan.

  4. 4

    Step 4 · Sample or first article

    Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.

  5. 5

    Step 5 · Pre-shipment inspection

    AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.

  6. 6

    Step 6 · Balance and loading

    Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.

Why this category through us

The three things that decide whether a category is worth importing

Compound named, not guessed

We quote formulation and hardness rather than "black rubber", so ageing and media resistance are decided in writing before tooling.

Mould ownership on paper

Tooling is your asset under the contract; we store it, maintain it and can transfer it without holding your production hostage.

Cure control documented

First articles are sectioned where needed to check cure and flash; the inspection plan covers the sealing faces that actually matter.

Supplier landscape

The supplier landscape for Rubber & Plastic Parts: what each type is good at

Three ways to buy this category in China, and the specific failure mode each carries. We name ours plainly.

Factory-direct
One moulding shop runs fixed press sizes and its own compounds, prices a small custom cavity poorly and answers overseas compound questions slowly.
Trading company
A trader sells generic rubber with margin, and nobody in-region confirms formulation, hardness or compression set against the ageing and media you need.
Consolidator / integrator
A shipping integrator cannot judge cure, flash on a sealing face, or a bonded-to-metal pull test that decides whether the part holds.

Where we sit

Direct sourcing with in-region cure and flash verification, mould held transferable

Moulded parts fail subtly, so we specify compound by formulation, check cure and flash against an agreed plan, and keep your mould transferable.

Documented specifications

Rubber & Plastic Parts: listed product sheets

Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.

Rubber & Plastic Parts: buyer questions

Do you make the mould or outsource it?

Moulds are machined by partner tool rooms we have audited. You get the mould drawing, steel spec and a photo of the engraved part number before first shots.

Can you match a compound for oil, ozone or temperature exposure?

Tell us the medium, concentration, temperature and cycle. We recommend NBR for mineral oil, EPDM for ozone/steam, FKM for high temperature and aggressive media, VMQ for food and heat.

Is bonding rubber to metal possible?

Yes, with adhesive-bonded or moulded-in inserts. Pull tests are recorded per batch, and we can prepare bonded samples for your validation.

How do you handle colour and surface appearance?

Colour is specified by RAL or Pantone with an approved master sample; appearance A-side/B-side is defined on the drawing so flash placement is not argued later.

What documentation comes with a food-contact part?

For approved compounds we supply the compliance statement (EU 10/2011 or FDA 21 CFR) and the certificate of conformity from the compound producer.

Inside the quotation — what comes back, and in what order
  • What we priced

    The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.

  • Price, and what it covers

    Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.

  • The lead time and what drives it

    A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.

  • What we are unsure of — and what we would change

    Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.

  • What our own paperwork covers, and who issues the rest

    The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.

Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.

Send the drawing here — name, email, what you need

Request for quotation

Tell us what you need made or sourced

Send drawings, a photo or just a part name — we reply within 1 working day.

Only your name, your e-mail and the requirement — typed or recorded — are needed to send. Leave anything else blank and it comes back as a question in our reply instead of stopping you here.

Name, company and e-mail are the only required fields — nothing else blocks the enquiry.

Drawings are treated as confidential — tell us if you need an NDA first, and we will send one before you attach anything.

PDF, DWG, DXF, STEP, IGES, SLT, Office, CSV, PNG, JPG, ZIP or an audio recording — up to 4 files, 10 MB each.

We log the file list with your enquiry; the files themselves travel to the sales desk as mail attachments, not into a database record. Bigger than this? Send quote@verabom.com a link and we will pick it up.

By sending this form you agree we may contact you about this enquiry. We never resell your data — see our privacy policy.

Written first reply within 1 working day; priced answer within 2-5 working days.

Get a rubber & plastic parts quotation in 2-5 working days

Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for rubber & plastic.