Xingtai, Hebei · Hebei industrial clusters

Cangzhou / Renqiu tool & die cluster

Mould supplier and sourcing partner in China — injection, die-cast, stamping and extrusion tooling

A mould is bought once and judged for a million cycles. We start with a DFM and mould-flow report on your part: wall thickness, sink risk, gate position, weld lines, shrinkage and draft — with the proposed steel, cavitation and cooling layout on the same page, so the tooling decision is made before the plate is cut.

Cavity and core steels are selected for the resin and the shot count; venting, ejection and cooling circuits are machined on CNC and EDM, assembled, and tried on the correct press class with your material.

You receive T1 samples with a dimensional report, the mould drawing in both languages, the steel certificates and a maintenance manual, and the tool can be shipped or kept in-house for part production.

Verified facts on Moulds

  • Tool steels P20, 718H, NAK80, S136 and H13; mould steel held to ±0.01 mm; 1 to 128 cavities on clamp forces from 160 to 2,000 T; T1 samples in 30–45 days and production tool release in 45–70 days, with the DFM and mould-flow reports returned to you.
  • We answer every RFQ with a written first reply within 1 working day and a priced quotation within 2-5 working days, and the AQL 2.5 pre-shipment inspection report travels in the crate as an original; EN 10204 3.1 material certificates accompany the categories that call for them.
  • The tool is cut, fitted and assembled in partner tool rooms in the Cangzhou / Renqiu belt; we do not own a mould shop, and shot lifetime is stated per steel, resin and filler rather than as a blanket figure.

Production capability

Injection Moulds & Tooling Manufacturer & Factory Direct — what we actually build

These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.

Injection Moulds & Tooling capability
Mould typesInjection (thermoplastic), over-mould, insert, blow, compression, die-cast, press & deep-draw
Cavitation1 - 128 cavities; family tools discouraged, we state why if you need one
Mould steelP20, 718H, NAK80, S136/Stavax, H13 for Al die casting, SKD11/D2 for dies
Mould baseLKM standard, HASCO / DME components available, 160 - 2,000 T clamp
Runner systemsCold, insulated, hot runner (YUDO / HRS / Synventive), valve gate, sequential
CoolingBaffled & bubbler cores, conformal where needed, water-flow tested at 6 bar
FinishSpark-erosion, polished to SPI A2/A1, texture to VDI 3400 (grain 12 - 48)
TolerancesMould steel to ±0.01 mm; moulded part per agreed inspection plan
Lifetime500,000 - 2,000,000 shots depending on steel, resin and fillers; assessed per tool against the stated shot life
EngineeringMould-flow (Moldflow/Moldex3D), DFM report, 2D + 3D, venting & ejection analysis

Materials we quote as standard

  • P20 pre-hardened steel
  • 718H / 4Cr13Ni3Mo
  • NAK80 mirror-polish steel
  • S136 stainless for PVC/PC
  • H13 for aluminium die casting

Typical applications

  • Automotive interior, under-hood and trim parts
  • Houseware, electronics housings and containers
  • Agricultural sprayer, pump and valve components
  • Sheet-metal brackets, deep-drawn shells and electrical enclosures

Industries served & customs codes

Industries
Automotive, Consumer goods, Electronics, Housewares, Agricultural equipment
Common HS codes
8480.7100 / 8480.4100 / 8480.4990 / 8207.3000
Listed items
8 documented specification sheets

Definition

Moulds: the three call-outs that decide acceptance

An injection mould is the tool that turns resin into a part: the cavity and core set the geometry, the runner and cooling decide how fast it fills and sets, and the steel grade decides how many shots it lasts. Acceptance is measured on the moulded part, not on the block of steel.

A mould is quoted as a tool, not as a part: the DFM and mould-flow reports come with the quotation, T1 samples are measured against the agreed inspection plan, and shot life is stated per steel, resin and filler rather than as one number.

Numbers a buyer can quote

Mould types
Injection, over-mould, insert, blow, compression, die-cast, press & deep-draw
Cavities
1 – 128; mould base LKM, HASCO / DME components, 160 – 2,000 T clamp
Mould steel
P20, 718H, NAK80, S136/Stavax, H13 for aluminium die casting
Steel tolerance
Mould steel held to ±0.01 mm; moulded part per the agreed inspection plan
Cooling
Baffled / bubbler cores, conformal where needed, water-flow tested at 6 bar
Finish
Polished to SPI A2/A1; texture to VDI 3400 (grain 12 – 48)
Shot life
500,000 – 2,000,000 shots depending on steel, resin and filler
Lead time
Design review 3–7 days; T1 samples 30–45 days; production tool release 45–70 days

How an order runs

How to run an order on Moulds: six steps from enquiry to container

The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.

Specifications last reviewed — the newest product sheet in this category.

The six steps

  1. 1

    Step 1 · Enquiry

    Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.

  2. 2

    Step 2 · Written first reply

    Within 1 working day of the enquiry reaching us.

  3. 3

    Step 3 · Priced answer

    Within 2-5 working days: price per line, lead time, factory route and inspection plan.

  4. 4

    Step 4 · Sample or first article

    Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.

  5. 5

    Step 5 · Pre-shipment inspection

    AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.

  6. 6

    Step 6 · Balance and loading

    Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.

Why this category through us

The three things that decide whether a category is worth importing

Steel certificate with the tool

You get the hardness report and the steel grade certificate for cavity inserts, not a claim that the steel "is P20".

T1 with a dimensional report

First shots are measured against your drawing, with the steel-referenced deviations listed next to the recommended correction.

Mould ownership documented

The tool is your property, marked with your part number, stored with a maintenance record and releasable — including for a later move to another moulder.

Production under the same roof

If you want parts, the tool runs on matched press/clamp tonnage here, so the learning curve is not your problem.

Supplier landscape

The supplier landscape for Injection Moulds & Tooling: what each type is good at

Three ways to buy this category in China, and the specific failure mode each carries. We name ours plainly.

Factory-direct
A tool room taking one programme at a time will hold yours behind an urgent domestic job, and it does not send a progress photograph unless you ask, so T1 arrives weeks after the date on the order.
Trading company
A brokered mould is specified second-hand: the plate steel one grade cheaper than the order named, venting and ejection left to the draughtsman, and no DFM record, so the corrections you paid for arrive as production delays.
Consolidator / integrator
A freight-side consolidator cannot judge a tool; a mould that will not hold its tolerance is only visible once it is making parts on your press.

Where we sit

Programme-side tooling management with the engineering record kept

Moulds are bought on evidence: DFM and mould-flow review before cutting steel, plate and component records for the tool, and a measured T1 report before you authorise production tooling.

Documented specifications

Injection Moulds & Tooling: listed product sheets

Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.

Injection Moulds & Tooling: buyer questions

What do you need to quote a mould?

The 3D part file with the resin, colour, wall thickness, expected annual volume and, if available, sample parts. We then propose cavitation, steel and gate location in the DFM report for your approval.

Can you ship the mould to my other supplier later?

Yes. Tooling ownership is contractual, we engrave your part number on the plates and supply the spare-parts list and the mould drawing, so the receiving moulder can run it and maintain it.

Do you run mould-flow analysis on every tool?

On multi-cavity, thin-wall, optical and large-part tools it is included. On a simple single-cavity tool we quote it as an option and explain, in the DFM, where fill and weld-line risk would be.

What is realistic for hot-runner cost?

A hot runner adds 25 - 70 % to tool cost but removes sprue waste and finishing labour. We compare both scenarios with your part weight and cycle time so the payback is visible.

How are moulds packed for export?

Plates are oiled or VCI-treated, cavity faces protected, the mould is banded inside a fumigated plywood case with the spare-parts kit boxed separately and the block list marked.

Inside the quotation — what comes back, and in what order
  • What we priced

    The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.

  • Price, and what it covers

    Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.

  • The lead time and what drives it

    A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.

  • What we are unsure of — and what we would change

    Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.

  • What our own paperwork covers, and who issues the rest

    The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.

Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.

Send the drawing here — name, email, what you need

Request for quotation

Tell us what you need made or sourced

Send drawings, a photo or just a part name — we reply within 1 working day.

Only your name, your e-mail and the requirement — typed or recorded — are needed to send. Leave anything else blank and it comes back as a question in our reply instead of stopping you here.

Name, company and e-mail are the only required fields — nothing else blocks the enquiry.

Drawings are treated as confidential — tell us if you need an NDA first, and we will send one before you attach anything.

PDF, DWG, DXF, STEP, IGES, SLT, Office, CSV, PNG, JPG, ZIP or an audio recording — up to 4 files, 10 MB each.

We log the file list with your enquiry; the files themselves travel to the sales desk as mail attachments, not into a database record. Bigger than this? Send quote@verabom.com a link and we will pick it up.

By sending this form you agree we may contact you about this enquiry. We never resell your data — see our privacy policy.

Written first reply within 1 working day; priced answer within 2-5 working days.

Get a injection moulds & tooling quotation in 2-5 working days

Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for moulds.