Steel certificate with the tool
You get the hardness report and the steel grade certificate for cavity inserts, not a claim that the steel "is P20".
Xingtai, Hebei · Hebei industrial clusters · Written first reply within 1 working day; priced answer within 2-5 working days.
Cangzhou / Renqiu tool & die cluster
A mould is bought once and judged for a million cycles. We start with a DFM and mould-flow report on your part: wall thickness, sink risk, gate position, weld lines, shrinkage and draft — with the proposed steel, cavitation and cooling layout on the same page, so the tooling decision is made before the plate is cut.
Cavity and core steels are selected for the resin and the shot count; venting, ejection and cooling circuits are machined on CNC and EDM, assembled, and tried on the correct press class with your material.
You receive T1 samples with a dimensional report, the mould drawing in both languages, the steel certificates and a maintenance manual, and the tool can be shipped or kept in-house for part production.
Verified facts on Moulds
Production capability
These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.
| Mould types | Injection (thermoplastic), over-mould, insert, blow, compression, die-cast, press & deep-draw |
|---|---|
| Cavitation | 1 - 128 cavities; family tools discouraged, we state why if you need one |
| Mould steel | P20, 718H, NAK80, S136/Stavax, H13 for Al die casting, SKD11/D2 for dies |
| Mould base | LKM standard, HASCO / DME components available, 160 - 2,000 T clamp |
| Runner systems | Cold, insulated, hot runner (YUDO / HRS / Synventive), valve gate, sequential |
| Cooling | Baffled & bubbler cores, conformal where needed, water-flow tested at 6 bar |
| Finish | Spark-erosion, polished to SPI A2/A1, texture to VDI 3400 (grain 12 - 48) |
| Tolerances | Mould steel to ±0.01 mm; moulded part per agreed inspection plan |
| Lifetime | 500,000 - 2,000,000 shots depending on steel, resin and fillers; assessed per tool against the stated shot life |
| Engineering | Mould-flow (Moldflow/Moldex3D), DFM report, 2D + 3D, venting & ejection analysis |
Definition
An injection mould is the tool that turns resin into a part: the cavity and core set the geometry, the runner and cooling decide how fast it fills and sets, and the steel grade decides how many shots it lasts. Acceptance is measured on the moulded part, not on the block of steel.
A mould is quoted as a tool, not as a part: the DFM and mould-flow reports come with the quotation, T1 samples are measured against the agreed inspection plan, and shot life is stated per steel, resin and filler rather than as one number.
How an order runs
The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.
Specifications last reviewed — the newest product sheet in this category.
Step 1 · Enquiry
Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.
Step 2 · Written first reply
Within 1 working day of the enquiry reaching us.
Step 3 · Priced answer
Within 2-5 working days: price per line, lead time, factory route and inspection plan.
Step 4 · Sample or first article
Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.
Step 5 · Pre-shipment inspection
AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.
Step 6 · Balance and loading
Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.
Why this category through us
You get the hardness report and the steel grade certificate for cavity inserts, not a claim that the steel "is P20".
First shots are measured against your drawing, with the steel-referenced deviations listed next to the recommended correction.
The tool is your property, marked with your part number, stored with a maintenance record and releasable — including for a later move to another moulder.
If you want parts, the tool runs on matched press/clamp tonnage here, so the learning curve is not your problem.
Supplier landscape
Three ways to buy this category in China, and the specific failure mode each carries. We name ours plainly.
Where we sit
Moulds are bought on evidence: DFM and mould-flow review before cutting steel, plate and component records for the tool, and a measured T1 report before you authorise production tooling.
Documented specifications
Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.
Moulds
Two-cavity mould for a polypropylene thin-wall container, P20 core and cavity, balanced hot runner, water-cooled, built to your machine tonnage and shot data.
Moulds
Eight-cavity closure mould for a 28 mm screw cap with rotary unscrew cores, hardened cores and cavities, designed for 180 to 300 shot per minute machines.
Moulds
Two-cavity extrusion blow mould for a 5 litre HDPE jerry can with an overmoulded handle, parison control, cooled inserts and vented pinch-offs.
Moulds
Flash-type compression mould with four impressions for a NBR seal, H13 steel, chrome plated, with land and vent geometry drawn for your press and cure data.
Moulds
Eight-station progressive die for a 2 mm zinc bracket with blank, pierce, bend and curl stages, SKD11 punches, guided stripping and a pilot-feed lock.
Moulds
Sixteen-cavity liquid silicone rubber mould with cold runner and land geometry for a medical diaphragm, hardened steel, with cleanroom packing of samples.
Moulds
CNC machined aluminium pattern set with matchplate, locate pins and core prints for a resin sand casting, delivered with the drawing and shrinkage noted.
Moulds
Matched trim die and drilling fixture for a die cast aluminium housing, with hardened knives, locators and a gauge plate, validated against the part drawing.
The 3D part file with the resin, colour, wall thickness, expected annual volume and, if available, sample parts. We then propose cavitation, steel and gate location in the DFM report for your approval.
Yes. Tooling ownership is contractual, we engrave your part number on the plates and supply the spare-parts list and the mould drawing, so the receiving moulder can run it and maintain it.
On multi-cavity, thin-wall, optical and large-part tools it is included. On a simple single-cavity tool we quote it as an option and explain, in the DFM, where fill and weld-line risk would be.
A hot runner adds 25 - 70 % to tool cost but removes sprue waste and finishing labour. We compare both scenarios with your part weight and cycle time so the payback is visible.
Plates are oiled or VCI-treated, cavity faces protected, the mould is banded inside a fumigated plywood case with the spare-parts kit boxed separately and the block list marked.
What we priced
The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.
Price, and what it covers
Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.
The lead time and what drives it
A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.
What we are unsure of — and what we would change
Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.
What our own paperwork covers, and who issues the rest
The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.
Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.
Written first reply within 1 working day; priced answer within 2-5 working days.
Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for moulds.