DFM before price
Every enquiry gets a manufacturability review — impossible tolerances, deep pockets, thin walls and thread issues are flagged with a cheaper alternative.
Xingtai, Hebei · Hebei industrial clusters · Written first reply within 1 working day; priced answer within 2-5 working days.
Cangzhou / Hengshui machining shops
Send a STEP or a 2D drawing with GD&T and we return a DFM report plus a quotation from the shops that actually have the machine, the fixture and the gauge for that part. Prototypes run next to production batches, which is why the parts you approve are the parts you receive.
We consolidate machined assemblies from several factories — housings, shafts, fasteners, sheet metal — into one shipment and one inspection file.
Verified facts on CNC Parts
Production capability
These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.
| Processes | 3/4/5-axis milling, CNC turning, mill-turn, grinding, wire EDM |
|---|---|
| Part size | Milling 1,200 × 500 × 500 mm; turning Ø320 × 1,000 mm |
| Tolerance | General ±0.02 mm, critical ±0.005 mm |
| Surface finish | Ra 0.4 µm ground, Ra 0.8 µm milled |
| Materials | Al 6061/7075, Ck45, 4140/42CrMo4, 304/316L, brass, POM, Ti Gr5 |
| Finishes | Anodise II/III, zinc, Ni, Cr, passivate, electrophoresis, powder coat |
| Quantity | 1 pc prototype to 100,000 pcs per year |
| Inspection | CMM (coordinate measuring machine), height gauge, roughness, hardness |
| Documentation | FAI / PPAP, material cert 3.1, full dimensional report, RoHS/REACH |
| Turnaround | Prototype 3-10 days, batch 15-35 days |
Definition
A machined part is defined by its tolerances: the datums, fits and surface finish on the drawing decide which machine, which fixture and how many set-ups the part needs.
Machined parts are quoted to the tightest call-out on the drawing — general ±0.02 mm, critical ±0.005 mm, Ra 0.4 µm ground — from 1 pc for a prototype to 50–500 pcs for production, with prototypes in 3–10 days and production 15–35 days depending on finish and heat treatment.
How an order runs
The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.
Specifications last reviewed — the newest product sheet in this category.
Step 1 · Enquiry
Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.
Step 2 · Written first reply
Within 1 working day of the enquiry reaching us.
Step 3 · Priced answer
Within 2-5 working days: price per line, lead time, factory route and inspection plan.
Step 4 · Sample or first article
Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.
Step 5 · Pre-shipment inspection
AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.
Step 6 · Balance and loading
Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.
Why this category through us
Every enquiry gets a manufacturability review — impossible tolerances, deep pockets, thin walls and thread issues are flagged with a cheaper alternative.
Our shop list covers Swiss-type through 5-axis; we do not quote a 3-axis mill for a part that needs a turn-mill and then blame the tolerance.
Machined parts, sheet metal, shafts, fasteners and rubber items can be kitted, labelled and shipped as one order.
Supplier landscape
Three ways to buy this category in China, and the specific failure mode each carries. We name ours plainly.
Where we sit
We pick the shop whose machine and gauge already fit your part, verify it on CMM, then consolidate housings, shafts and fasteners into one invoice.
Documented specifications
Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.
CNC Parts
Two-stage gearbox housing machined from solid 6061-T6: bearing bores to H7, ±0.01 mm true position, Ra 1.6 sealing faces, Type III anodise, FAI report with 100% dimensional data.
CNC Parts
High-volume turned and bored bushings in copper-tin bronze with ground bores, oil grooves and chamfers, held to H7 bores at batch scale.
CNC Parts
Small-diameter complex turned parts in 316L and 17-4 PH on sliding-head lathes with live tooling, washed and packaged for controlled assembly.
CNC Parts
Complex aerospace-pattern aluminium parts machined on 5-axis centres from forged plate, thin-walled, hard anodised and dimensionally reported.
CNC Parts
Cast-then-machined pump and gearbox housings: machining of bearing bores, flange faces and drilled ports on casting supplied from the same region.
CNC Parts
Engineering-plastic parts turned and milled from PEEK, PTFE, PVDF and nylon for chemical, semi and food duty, with controlled finish and cleanliness.
CNC Parts
Hot-forged or bar-stock brass valve bodies turned, drilled and tapped for water, gas and hydraulic fittings, threaded to BSP/NPT.
CNC Parts
Precision milled and ground plate work in tool steel for die sets and fixtures: through-hardened blanks, ground both sides, wire-cut features added.
CNC Parts
Sheet-metal parts laser cut, formed, welded and finished as one package, with tolerance stack-up agreed before the first bend.
CNC Parts
Progressive-die precision stampings in steel, stainless and brass, 0.5-6 mm thick, with optional CNC finishing, deburring and surface treatment to the drawing.
CNC Parts
High-tolerance stampings for electronic hardware — connector shells, shielding cans, brackets and contacts — in copper alloys and stainless, with selective plating.
Yes. Our multi-axis and 5-axis capacity is quoted for civilian industrial end-use only. We ask what the part goes into, and we decline aerospace, defence and other controlled end-uses rather than find out afterwards; where an export licence would be needed we say so before you commit money.
STEP/IGES/X_T plus a 2D PDF with tolerances and finishes. SolidWorks and Inventor native files are fine too. Without a 2D drawing we quote the model and state assumed tolerances.
NDA before file exchange on request, drawings stored in an access-controlled folder, and no distribution to third parties beyond the specific shop producing the part.
Yes. FAI reports cover all called-out dimensions with actual values; full CMM reports are available at AQL or 100% depending on the agreed plan.
We manage them with audited processors in the same region: quench and temper, induction, carburising, anodising, zinc, nickel, chrome and passivation, each with certificates.
Tight tolerances, thin-wall and deep-pocket geometry, secondary operations, and finish masking. Our DFM report shows where the money goes so you can choose.
What we priced
The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.
Price, and what it covers
Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.
The lead time and what drives it
A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.
What we are unsure of — and what we would change
Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.
What our own paperwork covers, and who issues the rest
The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.
Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.
Written first reply within 1 working day; priced answer within 2-5 working days.
Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for cnc parts.