How do I find a reliable supplier in China?
Look for a supplier that can name its factories, show an inspection record per shipment and answer in writing within 1 working day. Reliability signals: business licence and customs registration verified, an in-person factory visit report, EN 10204 3.1 material certificates offered without being asked, AQL inspection levels stated in the quotation, and payment terms that leave the balance payable against the inspection report rather than before it.
Full answer →How do I verify a Chinese supplier before placing an order?
Verify in four layers: legal — business licence with its unified social credit code, tax record, customs registration; physical — the machines that will run your part seen live; technical — machine list and inspection equipment matched to your drawing; commercial — two shipments to your market with bills of lading. Then hold the first order to a deposit you can afford to lose, with the balance released only against an approved AQL report.
Full answer →Is it safer to buy from a Chinese factory directly or from a trading company?
For a single product family with in-house engineers, a factory is fine. For multi-category purchasing, a trading company with in-region staff is usually safer: it absorbs factory risk, consolidates shipments, and owns the document pack. The deciding test is presence — a trading company with sourcing and inspection staff inside the producing region can visit, measure and stop a bad lot; a mailbox intermediary cannot.
Full answer →What does AQL 2.5 inspection mean and is it enough?
AQL 2.5 is the acceptance quality limit for major defects in ISO 2859-1 sampling: at general inspection level II, a 200-piece lot is sampled at 32 pieces and rejected if 3 or more major defects appear. It is enough for general industrial goods; safety-critical or fitted components should be tightened to AQL 1.0 or 100% testing on the critical characteristic, stated in the purchase contract.
Full answer →What is an EN 10204 3.1 material certificate and why should I demand it?
EN 10204 3.1 is a mill certificate in which the manufacturer's independent inspection department confirms the delivered material meets the order specification, with test values traceable to the specific melt and lot. Type 2.2 is a statistical declaration without lot traceability; 3.2 adds an external witness. For load-bearing or pressure parts, 3.1 is the minimum that lets you trace a failed component back to its heat number.
Full answer →What payment terms are safe for a first order from China?
What protects you is the trigger, not the percentage. Sign the version where the balance is released by a pre-shipment inspection report you have approved — AQL 2.5, measured values, photographs — and paid only into a corporate account. Our own terms are a 50% T/T deposit to start production and the balance before the container is loaded, and we do not open letters of credit at present.
Full answer →What MOQ and sample policy should I expect from Chinese industrial suppliers?
Typical MOQ for industrial parts is 10-100 pieces per item; springs and corrugated packaging run 500+; prototypes and oversized machined parts 1-5. Stock-standard samples ship in 3-7 days freight collect; custom first articles take 10-20 days after drawing review, with tooling cost normally refunded against the first production order above 500 pieces. Trial orders below MOQ are possible against a small-lot surcharge.
Full answer →How long does production and shipping from China actually take?
Standard catalogued items: 15-25 days after deposit. Custom and OEM parts: 25-45 days including first-article approval. Large assemblies and prefab structures: 35-60 days. Add 3-7 days for stock samples, and ocean transit of roughly 25-35 days to North Europe or the US East Coast from Tianjin or Qingdao. Plan the inspection window inside production, not after it.
Full answer →Can I buy from several Chinese factories and receive one shipment?
Yes. Consolidation collects goods from multiple factories at one point, cubes out a single LCL or FCL container, and issues one document pack: one invoice set, one packing list, one bill of lading, certificates grouped by product family. It cuts freight per tonne, removes the risk of one family holding the others at customs, and needs one inspection window covering all families before loading.
Full answer →Where in China should I source hydraulic cylinders?
Hebei's Hengshui belt concentrates hydraulic cylinder and hose workshops, from welded mill-type cylinders to ISO 6020 tie-rod and telescopic tipper units; Cangzhou and Hengshui also cover the machining and chrome plating the barrel and rod need. Specify honed tube standard, bore tolerance H8, rod chrome thickness in microns and the seal brand, then demand a stroke test record per cylinder before loading.
Full answer →Where in China should I source industrial springs?
The Cangzhou and Jingxian area of Hebei is a long-established spring base: hot-wound die springs, torsion springs for trailer ramps and agricultural machinery, compression springs and wire forms. Buy against a specification of wire standard, coiling direction, leg geometry and cycle-life expectation, and require shot-peening and presetting to be stated on the drawing for fatigue-loaded parts.
Full answer →Where in China should I source rubber flexible cable like H07RN-F?
Hebei's Ningjin and surrounding cable counties produce rubber-sheathed flexible cables including H07RN-F and H05RN-F, welding cable and control cable. Demand HAR-marked construction per EN 50525, conductor class 5 stranding, a test certificate per drum, and drum lengths agreed in the order — short random drums are the most common hidden cost in cable purchasing.
Full answer →Where in China should I source CNC machined custom parts?
For custom machining, look at counties with dense machine-tool populations rather than brand cities: in Hebei, the Yuanshan and Yongnian areas around the Beijing-Guangzhou corridor host casting-plus-machining chains, while Qinghe and Xingtai cover alloy and component work. Route by process: 3/4/5-axis capacity, in-house CMM or height-gauge metrology, and heat-treatment and plating within one transfer.
Full answer →What documents should ship with an industrial import from China?
The core pack: commercial invoice, packing list, bill of lading, certificate of origin where duty preference applies, and product-specific evidence — EN 10204 3.1 material certificates for metal parts, test reports for cable and safety items, and the pre-shipment AQL inspection report with photographs. Agree the pack list in the purchase contract so nothing is "usually provided later".
Full answer →How should I handle a quality dispute with a Chinese supplier?
Document first, claim second: photograph and measure the non-conformity against the approved sample or drawing, send one written notice with the evidence, and require containment plus a corrective-action report inside five working days. Contract terms that work: replacement parts or credit note at the supplier's cost, decided within five working days, with a defect window written per product family rather than one blanket number.
Full answer →Should I buy FOB or DDP from China?
Choose FOB when you have a freight forwarder and want control of cost and carrier; the supplier's responsibility ends over the ship's rail at the named port, typically Tianjin, Qingdao or Shanghai. Choose DDP when you want one landed price with duty and delivery included and no customs involvement — convenient for first orders and e-commerce replenishment, slightly more expensive because the supplier prices the risk it carries.
Full answer →Why do sourcing offices concentrate on Hebei province in China?
Hebei surrounds Beijing and Tianjin with county-level industrial clusters: hydraulic and rubber work around Hengshui, shafts and springs around Cangzhou, cable at Ningjin, fasteners at Yongnian, steel and castings around Tangshan and Handan, bicycles at Pingxiang and Guangzong. The density means a sourcing team can visit, measure and consolidate several product families inside one day's drive, and cube them into one container at Tianjin.
Full answer →How do I check a Chinese supplier’s business licence and export rights?
Ask for the licence carrying the 18-digit Unified Social Credit Code, then look that code up in the National Enterprise Credit Information Publicity System: registered name, address and business scope must match the invoice, the contract and the customs declaration. The foreign-trade operator filing was abolished in late 2022, so what matters now is the supplier’s customs registration as consignor and its name on the bill of lading.
Full answer →What are the red flags of an unreliable Chinese supplier?
The reliable red flags are behavioural, not decorative: answers that move between sales, engineering and factory without matching; a specification quoted with no question about tolerance or material grade; refusal to name the producing region; payment demanded into a personal account; a certificate whose number does not trace to your heat, batch or model; and a price well below every other quote that never says what it removes.
Full answer →How do I verify a Chinese supplier without travelling to China?
Verification works at distance when the evidence is produced live: a video call on the shop floor during the shift that will run your part, a serial-numbered piece photographed against your drawing, a material certificate whose heat code can be traced, and an inspection report carrying measured values and photographs from that same week. Ask for what cannot be prepared in advance, and unreliable suppliers fail the request.
Full answer →What does third-party pre-shipment inspection in China cost, and who pays?
Agencies price pre-shipment inspection per man-day, not per order, so the figure moves with lot size, the agreed AQL level and travel distance to the plant. One man-day normally covers a single sampling plan for one product family. Ask the agency for its current rate instead of accepting a number quoted on its behalf, and settle in writing who pays before the deposit is transferred.
Full answer →How do I write an RFQ with a drawing so suppliers quote it correctly?
Send the drawing, then say what the drawing cannot see: the standard the part is made to, the material grades you will accept and the ones you will not, the tolerance you actually measure at receiving, quantity per release and per year, the coating call-out with its thickness range, and what happens if it fails. Quotations only become comparable when every supplier receives the same specification.
Full answer →What should a quotation from a Chinese supplier contain?
A usable quotation names the drawing or sample version it prices, the material grade and the dimensions it commits to, unit price with MOQ, trade term and validity, a lead time with the constraint driving it, the inspection level and the documents travelling with the goods, and an explicit list of what the supplier is not sure of. Anything shorter than that is a number, not an offer.
Full answer →Who is responsible if goods arrive damaged or short from China?
Responsibility follows the trade term and the paperwork. Under FOB or CIF the sea leg sits with the carrier and the insurer once the goods pass the ship’s rail, so marine insurance and the bill of lading matter more than a supplier’s promise. Photograph the outer cartons before the seals are broken, record batch numbers, and a documented claim receives a written decision within five working days.
Full answer →Can I watch production in China on video before I pay?
Yes, when the call is arranged around the shift rather than staged for the camera. A working video inspection runs during production hours, follows the line that will make your part, and pulls a finished piece at random to measure against your drawing. What it excludes is another customer’s tooling, moulds or labelled goods — where the honest substitute is the inspection and material records for your own batch.
Full answer →Do industrial parts imported from China need CE marking?
CE applies to products falling under an EU harmonisation directive or regulation — machinery, electrical equipment, personal protective equipment, construction products — and it is the manufacturer’s declaration, backed by a technical file and, where the rules require it, a notified body. Spare parts and semi-finished components frequently sit outside it. Ask which directive the article is said to fall under, then ask for the declaration naming that exact model.
Full answer →Why would a supplier turn down an order that looks normal?
Because the paperwork or the physics does not hold: no drawing or standard to inspect against, an invoice value you are asked to declare lower, a certificate borrowed from another batch, parts dressed to look branded, payment into a personal account, or an LCL lot whose freight costs more than the goods. A refusal with a stated reason is cheaper than a delivery you argue about afterwards.
Full answer →