Xingtai, Hebei · Hebei industrial clusters

Mengcun / Cangzhou pipe fitting & flange cluster

Butt-weld fittings and flanges supplier and sourcing partner in China — elbows, tees, reducers and flanges to ASME and EN

Piping components are bought on three things: whether the material really is what the invoice says, whether the wall schedule matches your line pressure, and whether the bevel ends will fit your pipe without a welder arguing with a grinder. We address all three with numbers on the quotation and a 3.1 certificate in the document pack.

Butt-weld fittings are produced from seamless and welded pipe by induction bending, pressing and forging; flanges are forged, machined and drilled on CNC centres. Both carbon and stainless come from mills we buy repeatedly, and heat numbers stay with the parts.

Mixed piping packages are our normal order: elbows and tees in several sizes, matched flanges, gaskets and bolting, consolidated into one marked shipment for a plant or a district-heating project.

Verified facts on Pipe Fittings

  • Buttwelded elbows, tees and reducers to ASME B16.9 from NPS 1/2 to 48 in SCH 10 to XXS, flanges to B16.5, B16.47, EN 1092-1 and JIS B2220 up to DN2,600 and Class 2,500, in A234 WPB, A403 stainless, A182 F304/F321/F5/F91, A105 forgings and duplex 2205/2507, with heat-number material certificates and positive material identification on the goods.
  • We answer every RFQ with a written first reply within 1 working day and a priced quotation within 2-5 working days, and the AQL 2.5 pre-shipment inspection report travels in the crate as an original; EN 10204 3.1 material certificates accompany the categories that call for them.
  • Fittings are forged, pushed and machined in the Mengcun / Cangzhou belt. EN 10204 3.1 certificates are issued by the maker for its own heat: we request them per heat and verify the chemistry on the parts, and we do not extend one size’s report to another size.

Production capability

Pipe Fittings & Flanges Manufacturer & Factory Direct — what we actually build

These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.

Pipe Fittings & Flanges capability
Elbows45°/90°/180° LR & SR, DN15 - DN1,200 (NPS 1/2 - 48), SCH 10 - XXS
Tees & reducersEqual/reducing tees, concentric & eccentric reducers, caps, laterals, nipples
FlangesWN, SO, BL, SW, TH, LJ; DN15 - DN2,600; Class 150 - 2,500; PN6 - PN40
Flange facesRF, FF, RTJ, Tongue & Groove; finish 125 - 250 AARH or spiral serrated
StandardsASME B16.9, B16.25, B16.5, B16.47, EN 1092-1, DIN 2527/2573, JIS B2220, GOST 12820
MaterialsA234 WPB/WPC, A420 WPL6, A403 WP304/304L/316/316L, A182 F304/F321/F5/F91, A105
Wall & tolerance±12.5 % on wall, ±1 mm OD; bevel 37.5° ±2.5° land 1.6 ±0.4 mm
TestingHT/PT/RT/UT, PMI on every stainless lot, hydrostatic on order, hardness after PWHT
TreatmentsSolution anneal + pickling, normalising, PWHT, stress relieving; NACE MR0175 option
MarkingStandard, size, schedule, material, heat number, manufacturer mark; paint stamp or dot

Materials we quote as standard

  • ASTM A234 WPB
  • A403 WP304L / WP316L
  • A182 F304 / F321 / F5
  • A105 forged steel
  • Duplex 2205 / 2507

Typical applications

  • Oil, gas and petrochemical piping
  • District heating and boiler houses
  • Water treatment and pumping stations
  • Shipbuilding, food plant and process skids

Industries served & customs codes

Industries
Oil & gas, Power & district heating, Water & wastewater, Shipbuilding, Process plant
Common HS codes
7307.1100 / 7307.2100 / 7307.9900 / 7308.9000
Listed items
18 documented specification sheets

Definition

Pipe Fittings: the three call-outs that decide acceptance

Pipe fittings connect by standard: schedule, dimensional standard and material grade decide whether a fitting mates with the pipe and holds the pressure.

Fittings are quoted on standard, schedule and face — DN15–DN1,200 elbows in SCH 10 to XXS, flanges to Class 2,500 with RF/FF/RTJ faces — at 50 pcs per size in carbon steel, 10–20 pcs in stainless and 1 pc for large bore, in 15–30 days, or 25–45 days for stainless, alloy and lined items.

Numbers a buyer can quote

Elbows
45°/90°/180° LR & SR, DN15 - DN1,200 (NPS 1/2 - 48), SCH 10 - XXS
Tees & reducers
Equal/reducing tees, concentric & eccentric reducers, caps, laterals, nipples
Flanges
WN, SO, BL, SW, TH, LJ; DN15 - DN2,600; Class 150 - 2,500; PN6 - PN40
Flange faces
RF, FF, RTJ, Tongue & Groove; finish 125 - 250 AARH or spiral serrated
Standards
ASME B16.9, B16.25, B16.5, B16.47, EN 1092-1, DIN 2527/2573, JIS B2220, GOST 12820
Materials
A234 WPB/WPC, A420 WPL6, A403 WP304/304L/316/316L, A182 F304/F321/F5/F91, A105
Wall & tolerance
±12.5 % on wall, ±1 mm OD; bevel 37.5° ±2.5° land 1.6 ±0.4 mm
Lead time
Carbon steel 15-30 days; stainless, alloy and lined items 25-45 days

How an order runs

How to run an order on Pipe Fittings: six steps from enquiry to container

The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.

Specifications last reviewed — the newest product sheet in this category.

The six steps

  1. 1

    Step 1 · Enquiry

    Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.

  2. 2

    Step 2 · Written first reply

    Within 1 working day of the enquiry reaching us.

  3. 3

    Step 3 · Priced answer

    Within 2-5 working days: price per line, lead time, factory route and inspection plan.

  4. 4

    Step 4 · Sample or first article

    Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.

  5. 5

    Step 5 · Pre-shipment inspection

    AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.

  6. 6

    Step 6 · Balance and loading

    Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.

Why this category through us

The three things that decide whether a category is worth importing

Positive material identification

A handheld spectrometer checks every stainless lot before it leaves the shop. The PMI reading is printed on the packing list next to the heat number.

Schedule, not "thick"

We confirm SCH/STD/XS/XXS and the actual wall measured on the fitting. Wall-thickness claims are the most common dispute in exported piping.

Bevels checked against your pipe

Where your pipe size is known we check the bore match and the internal offset so the root pass is not left to the fitter.

Complete bolting and gaskets

Stud bolts, nuts, washers, spiral-wound and ring gaskets can ship with the flanges so the joint arrives as one installable set.

Supplier landscape

The supplier landscape for Pipe Fittings & Flanges: what each type is good at

Three ways to buy this category in China, and the specific failure mode each carries. We name ours plainly.

Factory-direct
A fitting works prices its own size range and material plan, so a mixed pipeline package of twelve sizes in two grades arrives late or is split into several deliveries you then have to chase.
Trading company
Material grade is the whole order here: a WPB body at the edge of its chemistry, 304 supplied where 316L was specified, or a certificate that traces to a different heat. Only testing finds it, which is why we test.
Consolidator / integrator
Consolidators move tonnage efficiently and issue no mill certificate; without heat-number traceability your engineer cannot accept the spool into a coded line.

Where we sit

Heat-traced material sourcing with PMI on the goods

Piping is accepted on documentation: heat numbers, a certificate scope that actually covers your size, and a positive material check on the parts themselves are what let your welder start.

Documentation matrix

Which pipe fittings & flanges documents exist, who may issue them, and how you check

For fittings and flanges the deciding documents are the material certificate tied to the stamp and a wall-thickness record at the thinnest point — nominal wall is not measured wall.

Document, issuing party, our role, cost basis and verification route
DocumentWho may issue itWhat we doCost & time basisHow you verify
Material certificate to the pipe and fitting standardMill plus the makerEN 10204 3.1 for alloy and stainless; 2.2 for carbon where the duty allowsIncluded at the declared grade — a mill certificate is standard trade paperwork for pipe and fitting steelHeat number against the stamp on the fitting
Dimensional and wall-thickness recordThe makerChecked at goods-in against the standard’s tolerance, including the ovality that only shows up on paperMaker record requested from the maker — if it cannot be produced we tell you before you pay; our own goods-in measurement is includedWall at the thinnest point, not the nominal
Positive material identification on every stainless and alloy lotOur desk or the inspection body you appointHandheld spectrometer, readings printed against the heat numberIncluded on alloy lots — this is our own reading, so it does not depend on the makerAsk for the readings, not a statement
Radiographic or ultrasonic examination of weld seams on welded fittingsAn independent body or the maker’s Level-2 personnelWhere the duty calls for it we can commission it on your order, quoted before you commitQuoted per order before you commit; daysFilm or digital record reference on the report
Facing finish and gasket-surface measurement on flangesThe makerAsked for against the roughness band you specifiedRequested from the maker — if it cannot be produced we tell you before you payRa values in the record, not “as standard”
Assembled by us for this orderCompiled by us from the parties abovePacking list, invoice, mill certificates at the declared grade, our PMI readings on alloy lots, dimensional records where the maker produced them, and the inspection reportPacking list, invoice and mill certificates are standard; maker dimensional records requested per order — if they cannot be produced we tell you before you payStamp, certificate and packing list must agree

We hold no product certificates — those belong to manufacturers. How to verify any document you are shown →

Documented specifications

Pipe Fittings & Flanges: listed product sheets

Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.

Pipe Fittings & Flanges: buyer questions

Do you supply EN 10204 3.1 certificates as standard?

Yes for pressure-part orders. The certificate covers chemistry and mechanical properties against the heat number stamped on each item, and it is issued with the shipping documents rather than later on request.

Can you supply both ASME and DIN flange drills in one order?

Yes. Flanges are drilled on CNC centres, so B16.5 RF and DIN 2573 patterns can run in the same batch. We send the drilling drawing for approval on non-standard combinations.

Are large-diameter elbows mandrel bent or wrinkle bent?

Mandrel bending is used where roundness and wall thinning matter; we report the ovality (typically ≤1 %) and minimum remaining wall. Wrinkle bends are only offered where the spec allows them.

Can you handle a project bill of materials with 200 line items?

That is our normal project work. Send the BOM in Excel and we return a line-by-line quotation with material, standard, weight, certificate type and the consolidation plan per container.

How are flanges protected in transit?

Raised faces get plastic or plywood face guards, threaded items get caps, and items are interleaved with timber on strapped pallets so gasket faces are not scratched on the voyage.

Inside the quotation — what comes back, and in what order
  • What we priced

    The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph — long enough that a misread gets caught before the metal is cut.

  • Price, and what it covers

    Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.

  • The lead time and what drives it

    A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.

  • What we are unsure of — and what we would change

    Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.

  • What our own paperwork covers, and who issues the rest

    The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.

Not ready to send a drawing yet? Start with the two files we work from — RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.

Send the drawing here — name, email, what you need

Request for quotation

Tell us what you need made or sourced

Send drawings, a photo or just a part name — we reply within 1 working day.

Only your name, your e-mail and the requirement — typed or recorded — are needed to send. Leave anything else blank and it comes back as a question in our reply instead of stopping you here.

Name, company and e-mail are the only required fields — nothing else blocks the enquiry.

Drawings are treated as confidential — tell us if you need an NDA first, and we will send one before you attach anything.

PDF, DWG, DXF, STEP, IGES, SLT, Office, CSV, PNG, JPG, ZIP or an audio recording — up to 4 files, 10 MB each.

We log the file list with your enquiry; the files themselves travel to the sales desk as mail attachments, not into a database record. Bigger than this? Send quote@verabom.com a link and we will pick it up.

By sending this form you agree we may contact you about this enquiry. We never resell your data — see our privacy policy.

Written first reply within 1 working day; priced answer within 2-5 working days.

Get a pipe fittings & flanges quotation in 2-5 working days

Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for pipe fittings.