Xingtai, Hebei Β· Hebei industrial clusters

Tangshan / Yongnian / Renqiu steel cluster

Steel plate, profiles, pipe and cut parts with 3.1 certificates

We buy close to the mills β€” Tangshan hot-rolled coil, Yongnian bar and profiles, Renqiu pipe β€” and arrange processing (cutting, drilling, bending, welding, blasting, painting) at fabricators we have audited, so you receive finished sub-assemblies instead of a bundle and a problem.

Every heat number traces to a certificate held by the mill. We request the certificate pack per order and pass on what the mill issues, and we say on the quotation which lines have one before you commit.

Production capability

Steel Products Manufacturer & Factory Direct β€” what we actually build

These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.

Steel Products capability
Plate & coil2 - 200 mm, Q235B / Q355B / S355J2 / A36 / SS400
ProfilesAngle, channel, I/H-beam 40 - 600 mm, square & rectangular hollow
Bar & rodHot-rolled Ø5.5 - Ø150 mm, bright bar, forged blanks
Pipe & tubeSeamless and ERW Ø10 - Ø2,191 mm, schedules 20 - XXS
CuttingFibre laser to 25 mm, plasma to 60 mm, oxy-fuel to 200 mm, sawing
FormingPress brake to 1,100 T / 4 m, rolling, plate bending
WeldingMIG/TIG/submerged arc, EN ISO 3834-2 procedure, AWS D1.1 welders
FinishSa 2.5 blast, primer + PU 80-240 Β΅m, hot-dip galvanising to 85 Β΅m
TestingTensile, impact, UT/MT/PT NDT, hardness, dimensional
DocumentationEN 10204 3.1 mill certificate; SGS / BV / Intertek third-party inspection on request

Materials we quote as standard

  • Q235B / S235JR
  • Q355B-D / S355J2
  • A36 / A572
  • 42CrMo4 bar
  • 20# / API 5L pipe

Typical applications

  • Structural frames
  • Machinery bases and frames
  • Trailer and body building
  • Plant and skid fabrication

Industries served & customs codes

Industries
Construction, Structural steelwork, Machinery, Transport equipment
Common HS codes
7208.5200 / 7216.2100 / 7306.3000 / 7228.4000
Listed items
9 documented specification sheets

Definition

Steel: the three call-outs that decide acceptance

Steel products are sold by grade and condition: the standard, the delivery condition (hot-rolled, normalised or quenched and tempered) and the test certificate decide what the plate or bar can carry.

Steel is quoted by grade, size and delivery condition β€” plate 2–200 mm in Q235B/Q355B/S355J2/A36, sections to 600 mm, seamless and ERW tube to Ø2,191 mm β€” at 5–25 t per grade and size, with material in 10–20 days and fabricated or painted parts in 25–45 days.

Numbers a buyer can quote

Plate & coil
2 - 200 mm, Q235B / Q355B / S355J2 / A36 / SS400
Profiles
Angle, channel, I/H-beam 40 - 600 mm, square & rectangular hollow
Bar & rod
Hot-rolled Ø5.5 - Ø150 mm, bright bar, forged blanks
Pipe & tube
Seamless and ERW Ø10 - Ø2,191 mm, schedules 20 - XXS
Cutting
Fibre laser to 25 mm, plasma to 60 mm, oxy-fuel to 200 mm, sawing
Forming
Press brake to 1,100 T / 4 m, rolling, plate bending
Welding
MIG/TIG/submerged arc, EN ISO 3834-2 procedure, AWS D1.1 welders
Lead time
Material 10-20 days; fabricated and painted parts 25-45 days

How an order runs

How to run an order on Steel: six steps from enquiry to container

The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.

Specifications last reviewed β€” the newest product sheet in this category.

The six steps

  1. 1

    Step 1 Β· Enquiry

    Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.

  2. 2

    Step 2 Β· Written first reply

    Within 1 working day of the enquiry reaching us.

  3. 3

    Step 3 Β· Priced answer

    Within 2-5 working days: price per line, lead time, factory route and inspection plan.

  4. 4

    Step 4 Β· Sample or first article

    Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3–7 days, freight collect. Custom parts: first article in 10–20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.

  5. 5

    Step 5 Β· Pre-shipment inspection

    AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.

  6. 6

    Step 6 Β· Balance and loading

    Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.

Why this category through us

The three things that decide whether a category is worth importing

Heat-number traceability

Marked parts, matching certificates and a bundle list your quality department can audit without chasing us.

Processing next to the material

Cut and welded parts avoid a second inbound freight leg, which is where most of the schedule usually slips.

Weight tolerance stated

We quote nominal or actual weight explicitly and declare the Β±% tolerance of the mill, so invoicing is not a negotiation.

Documentation matrix

Which steel products documents exist, who may issue them, and how you check

For steel, one document decides whether the lot is usable: the mill certificate tying chemistry and mechanical results to the heat number stencilled on the plate.

Document, issuing party, our role, cost basis and verification route
DocumentWho may issue itWhat we doCost & time basisHow you verify
EN 10204 3.1 mill certificate (chemistry, mechanical, heat treatment)The millSpecified on the enquiry, collected per heat, matched to the marking on the plateIncluded at the 3.1 grade β€” a mill certificate is standard trade paperwork at that grade; longer lead for non-standard gradesHeat number on the certificate against the number stencilled on the plate
Delivery-condition test to the product standard (for example structural steel test at delivery)The millWe state grade, condition and thickness band on the quotationIncluded where the product standard calls for those tests at that grade; otherwise requested from the maker β€” if it cannot be produced we tell you before you payGrade and thickness on the certificate must match the order line
Ultrasonic or volumetric examination of plateMill laboratory or an independent bodyWhere the part is a pressure or welded structural item, we can commission it on your order, quoted before you commitQuoted per order before you commit; daysReport references the same heat and the same piece
Dimensional and flatness recordMill or service centreRequested for machined blanksRequested from the maker β€” if it cannot be produced we tell you before you payCompare against the tolerance you specified, not the nominal
Certificate of origin (CO / Form E / Form A)The council or customs authority named on the documentWe arrange it with the shipping documentsIncluded with the export documents; two to three working daysNumber checkable with the named issuer
Assembled by us for this orderCompiled by us from the parties abovePacking list and commercial invoice with every shipment, mill certificates where the grade calls for them, test records where we commissioned them on your order, and the pre-shipment inspection report when inspection is part of the orderPacking list, invoice and origin documents are standard; maker-dependent records are requested per order β€” if they cannot be produced we tell you before you payOne document set, one file, numbers cross-referenced

We hold no product certificates β€” those belong to manufacturers. How to verify any document you are shown β†’

Documented specifications

Steel Products: listed product sheets

Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.

Steel Products: buyer questions

Can you send mill certificates before shipment?

Yes β€” EN 10204 3.1 certificates for each heat go into the document pack and can be emailed as drafts as soon as the rolling order is closed.

Do you export to EU customers with CE-marked structural steel?

For CE-marking under EN 1090 we work with factories holding a valid Certificate of Conformity and FPC audit; we state the certificate number on the quotation.

What is the practical minimum order?

Roughly 5 t per size for stocked grades, 25 t for non-standard. Below that, we consolidate with another order or quote a small-lot surcharge.

How is rust prevented on ocean transit?

VCI paper plus desiccant for machined faces, stowage with dunnage, and optionally temporary hardeners or shipping oil. Hot-dip galvanising for long-term exposure.

Can you supply cut-to-length bundles with a bar mark list?

Yes. We send the cutting list with marks, weights and destination on each member so erection or assembly is not blocked by sorting.

Inside the quotation β€” what comes back, and in what order
  • What we priced

    The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph β€” long enough that a misread gets caught before the metal is cut.

  • Price, and what it covers

    Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.

  • The lead time and what drives it

    A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.

  • What we are unsure of β€” and what we would change

    Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.

  • What our own paperwork covers, and who issues the rest

    The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.

Not ready to send a drawing yet? Start with the two files we work from β€” RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.

Send the drawing here β€” name, email, what you need

Request for quotation

Tell us what you need made or sourced

Send drawings, a photo or just a part name β€” we reply within 1 working day.

Only your name, your e-mail and the requirement β€” typed or recorded β€” are needed to send. Leave anything else blank and it comes back as a question in our reply instead of stopping you here.

Name, company and e-mail are the only required fields β€” nothing else blocks the enquiry.

Drawings are treated as confidential β€” tell us if you need an NDA first, and we will send one before you attach anything.

PDF, DWG, DXF, STEP, IGES, SLT, Office, CSV, PNG, JPG, ZIP or an audio recording β€” up to 4 files, 10 MB each.

We log the file list with your enquiry; the files themselves travel to the sales desk as mail attachments, not into a database record. Bigger than this? Send quote@verabom.com a link and we will pick it up.

By sending this form you agree we may contact you about this enquiry. We never resell your data β€” see our privacy policy.

Written first reply within 1 working day; priced answer within 2-5 working days.

Get a steel products quotation in 2-5 working days