Heat-number traceability
Marked parts, matching certificates and a bundle list your quality department can audit without chasing us.
Xingtai, Hebei Β· Hebei industrial clusters Β· Written first reply within 1 working day; priced answer within 2-5 working days.
Tangshan / Yongnian / Renqiu steel cluster
We buy close to the mills β Tangshan hot-rolled coil, Yongnian bar and profiles, Renqiu pipe β and arrange processing (cutting, drilling, bending, welding, blasting, painting) at fabricators we have audited, so you receive finished sub-assemblies instead of a bundle and a problem.
Every heat number traces to a certificate held by the mill. We request the certificate pack per order and pass on what the mill issues, and we say on the quotation which lines have one before you commit.
Production capability
These are the envelope numbers our partner shops work to. If your requirement sits outside them, say so in the enquiry and we will name the shop that can do it.
| Plate & coil | 2 - 200 mm, Q235B / Q355B / S355J2 / A36 / SS400 |
|---|---|
| Profiles | Angle, channel, I/H-beam 40 - 600 mm, square & rectangular hollow |
| Bar & rod | Hot-rolled Γ5.5 - Γ150 mm, bright bar, forged blanks |
| Pipe & tube | Seamless and ERW Γ10 - Γ2,191 mm, schedules 20 - XXS |
| Cutting | Fibre laser to 25 mm, plasma to 60 mm, oxy-fuel to 200 mm, sawing |
| Forming | Press brake to 1,100 T / 4 m, rolling, plate bending |
| Welding | MIG/TIG/submerged arc, EN ISO 3834-2 procedure, AWS D1.1 welders |
| Finish | Sa 2.5 blast, primer + PU 80-240 Β΅m, hot-dip galvanising to 85 Β΅m |
| Testing | Tensile, impact, UT/MT/PT NDT, hardness, dimensional |
| Documentation | EN 10204 3.1 mill certificate; SGS / BV / Intertek third-party inspection on request |
Definition
Steel products are sold by grade and condition: the standard, the delivery condition (hot-rolled, normalised or quenched and tempered) and the test certificate decide what the plate or bar can carry.
Steel is quoted by grade, size and delivery condition β plate 2β200 mm in Q235B/Q355B/S355J2/A36, sections to 600 mm, seamless and ERW tube to Γ2,191 mm β at 5β25 t per grade and size, with material in 10β20 days and fabricated or painted parts in 25β45 days.
How an order runs
The reply clock and the factory clock are separate: the first steps run on working days, the last ones run on the schedule named in your quotation.
Specifications last reviewed β the newest product sheet in this category.
Step 1 Β· Enquiry
Send the drawing, photo, OE reference or a plain description; NDA and confidentiality are available before drawings are exchanged.
Step 2 Β· Written first reply
Within 1 working day of the enquiry reaching us.
Step 3 Β· Priced answer
Within 2-5 working days: price per line, lead time, factory route and inspection plan.
Step 4 Β· Sample or first article
Free DFM (design-for-manufacturing) review on submitted drawings. Samples of stock-standard items ship in 3β7 days, freight collect. Custom parts: first article in 10β20 days after drawing review; tooling cost refunded against the first production order above 500 pcs.
Step 5 Β· Pre-shipment inspection
AQL 2.5 general inspection on every shipment (AQL 1.0 on safety-critical items). EN 10204 3.1 material certificates, dimensional reports and photos are sent for approval before loading.
Step 6 Β· Balance and loading
Balance settled in full before the container is loaded, and only after you have approved the inspection report and photo pack; one container, one document pack.
Why this category through us
Marked parts, matching certificates and a bundle list your quality department can audit without chasing us.
Cut and welded parts avoid a second inbound freight leg, which is where most of the schedule usually slips.
We quote nominal or actual weight explicitly and declare the Β±% tolerance of the mill, so invoicing is not a negotiation.
Documentation matrix
For steel, one document decides whether the lot is usable: the mill certificate tying chemistry and mechanical results to the heat number stencilled on the plate.
| Document | Who may issue it | What we do | Cost & time basis | How you verify |
|---|---|---|---|---|
| EN 10204 3.1 mill certificate (chemistry, mechanical, heat treatment) | The mill | Specified on the enquiry, collected per heat, matched to the marking on the plate | Included at the 3.1 grade β a mill certificate is standard trade paperwork at that grade; longer lead for non-standard grades | Heat number on the certificate against the number stencilled on the plate |
| Delivery-condition test to the product standard (for example structural steel test at delivery) | The mill | We state grade, condition and thickness band on the quotation | Included where the product standard calls for those tests at that grade; otherwise requested from the maker β if it cannot be produced we tell you before you pay | Grade and thickness on the certificate must match the order line |
| Ultrasonic or volumetric examination of plate | Mill laboratory or an independent body | Where the part is a pressure or welded structural item, we can commission it on your order, quoted before you commit | Quoted per order before you commit; days | Report references the same heat and the same piece |
| Dimensional and flatness record | Mill or service centre | Requested for machined blanks | Requested from the maker β if it cannot be produced we tell you before you pay | Compare against the tolerance you specified, not the nominal |
| Certificate of origin (CO / Form E / Form A) | The council or customs authority named on the document | We arrange it with the shipping documents | Included with the export documents; two to three working days | Number checkable with the named issuer |
| Assembled by us for this order | Compiled by us from the parties above | Packing list and commercial invoice with every shipment, mill certificates where the grade calls for them, test records where we commissioned them on your order, and the pre-shipment inspection report when inspection is part of the order | Packing list, invoice and origin documents are standard; maker-dependent records are requested per order β if they cannot be produced we tell you before you pay | One document set, one file, numbers cross-referenced |
We hold no product certificates β those belong to manufacturers. How to verify any document you are shown β
Documented specifications
Each sheet is the format we quote in: parameters, materials, MOQ, sampling, packing and the questions that come up before the first order.
Steel
Normalized hot-rolled plate to EN 10025-2 S355J2+N, 20 mm thick, 2,000 Γ 6,000 mm sizes, cut-to-length with EN 10204 3.1 mill certificates per heat.
Steel
Hot-dip galvanised corrugated roofing in DX51D+AZ100, 0.50 mm, trapezoidal 828/10 profile, cut to length with pilot holes for purlin fixings.
Steel
Seamless carbon steel line pipe for process and structural duty: Γ114.3 mm OD, 6.02 mm wall, ASTM A106 Gr.B / EN 10216-1, bevelled ends and hydrostatic test per length.
Steel
Hot-dip galvanised structural square tube, 80 Γ 80 mm with 4.0 mm wall, EN 10219 cold-formed S355, in 6 m lengths for frames, platforms and machinery guarding.
Steel
Mill-hot-rolled equal angle 75 Γ 75 Γ 8 mm in SS400/Q235B for bracing, frames and support steel, bundled in 6 m or 12 m lengths with a measured weight table.
Steel
Cold-drawn and straightened round bar Γ40 mm in Ck45/1045 for machined shafts and pins: h9 straight-cut lengths, Ra-friendly surface, heat-by-heat chemistry.
Steel
Cold-rolled stainless sheet 1.5 mm in 304/1.4301, 2B finish, 1,250 Γ 2,500 mm mill sheet, foil-protected on request, with EN 10204 3.1 per heat.
Steel
Forged and heat-treated 42CrMo4 round bar Γ90 mm in +QT condition, UT-tested core, hardness mapped per bar β the starting material for high-duty shafts and gear blanks.
Steel
NM450 / AR450 abrasion-resistant steel plate, 6-50 mm, quenched and tempered to 450 HB, plasma or laser cut to the drawing with the hardness and cutting report.
Yes β EN 10204 3.1 certificates for each heat go into the document pack and can be emailed as drafts as soon as the rolling order is closed.
For CE-marking under EN 1090 we work with factories holding a valid Certificate of Conformity and FPC audit; we state the certificate number on the quotation.
Roughly 5 t per size for stocked grades, 25 t for non-standard. Below that, we consolidate with another order or quote a small-lot surcharge.
VCI paper plus desiccant for machined faces, stowage with dunnage, and optionally temporary hardeners or shipping oil. Hot-dip galvanising for long-term exposure.
Yes. We send the cutting list with marks, weights and destination on each member so erection or assembly is not blocked by sorting.
What we priced
The drawing or sample version, the material grade, and the dimensions we will hold to. One paragraph β long enough that a misread gets caught before the metal is cut.
Price, and what it covers
Unit price, MOQ, trade term, packing and how long the price stands. Where the workshop separates material from machining we show both lines; where it gives one number, we say so rather than inventing a split.
The lead time and what drives it
A date plus the thing behind it: furnace or plating-bath scheduling, the mill minimum for that section, gauge availability. A date with no constraint named is a guess.
What we are unsure of β and what we would change
Written into the quotation, not discovered in the shipment: the fit we cannot confirm, the process we would send outside the belt, the certificate we cannot obtain. Where a cheaper grade or a looser tolerance still does the job we say so; where we have no better idea, we say that too.
What our own paperwork covers, and who issues the rest
The AQL 2.5 inspection report, the material certificate where the category calls for one, and photographs taken before the crate closes.
Not ready to send a drawing yet? Start with the two files we work from β RFQ spec template and the pre-shipment checklist. Fill them in when you are ready; the enquiry box below stays open.
Written first reply within 1 working day; priced answer within 2-5 working days.
Send drawings, a sample description or an existing part number. We reply with price, factory route, schedule and the inspection plan for steel.