How do I verify a Chinese supplier before placing an order?
Verify in four layers: legal — business licence with its unified social credit code, tax record, customs registration; physical — the machines that will run your part seen live; technical — machine list and inspection equipment matched to your drawing; commercial — two shipments to your market with bills of lading. Then hold the first order to a deposit you can afford to lose, with the balance released only against an approved AQL report.
Detail 1
Match machines to your drawing
A factory quote is only as good as the machine list behind it. Ask which machine will run each operation, its bed size or envelope, and its age. For machined parts, confirm whether a CMM or at least height gauge and roughness tester exist in-house; outsourced metrology adds days and hides variation.
Detail 2
Put the QC checkpoints in the contract
Incoming material certificate, in-process checkpoint dimensions, and pre-shipment AQL level with the sampling plan named. Written into the purchase contract, these turn quality from a hope into an invoiceable obligation.
Written first reply within 1 working day; priced answer within 2-5 working days.