How long does production and shipping from China actually take?
Standard catalogued items: 15-25 days after deposit. Custom and OEM parts: 25-45 days including first-article approval. Large assemblies and prefab structures: 35-60 days. Add 3-7 days for stock samples, and ocean transit of roughly 25-35 days to North Europe or the US East Coast from Tianjin or Qingdao. Plan the inspection window inside production, not after it.
Detail 1
Where schedules actually slip
Material procurement for special grades, heat-treatment queueing, and plating capacity in environmental-controlled parks. Ask which of the three is on your critical path and get the park or subcontractor named.