What should a quotation from a Chinese supplier contain?
A usable quotation names the drawing or sample version it prices, the material grade and the dimensions it commits to, unit price with MOQ, trade term and validity, a lead time with the constraint driving it, the inspection level and the documents travelling with the goods, and an explicit list of what the supplier is not sure of. Anything shorter than that is a number, not an offer.
Detail 1
The paragraph most buyers skip
The uncertainty paragraph: the fit a workshop cannot confirm, the process it has to send outside its own walls, the certificate it cannot obtain, the cheaper grade or looser tolerance that would still do the job. Written into the quotation these are a supplier showing you where the risk sits; left out, you meet the same facts at receiving inspection.
Detail 2
Comparing two quotations honestly
Put them in one table row by row: grade, hardness, coating thickness, tolerance held, inspection standard, packing, freight term, price validity. Two identical unit prices with different packing specifications or a different AQL level are not the same offer, and the gap only appears once it is written down.
Written first reply within 1 working day; priced answer within 2-5 working days.
Need this answered for your part?
Send the specification — the quotation repeats the answer with your numbers in it.