Xingtai, Hebei · Hebei industrial clusters

OEM machine builder, Central Europe · 1 June 2026

Recurring welded mill cylinders for a European press builder

The buyer rebuilt 200-250 mm bore mill cylinders twice a year and kept losing weeks to seal-kit mismatches and rod chrome that spalled inside twelve months. Their previous supplier quoted per drawing but never owned the seal specification.

What we did

Specification and inspection decisions

Result

What changed for the buyer

Volume
40-60 pcs per release, two releases per year
Inspection
AQL 1.0 on seal seats and rod chrome, 100% stroke test
Terms
50% deposit, balance before loading against the approved inspection report

Written first reply within 1 working day; priced answer within 2-5 working days.

Bring us the problem, not just the part number

We quote the route, the inspection plan and the price — in writing, within 2-5 working days.