- MOQ
- 10 pcs per design; single castings accepted for replacement bases
- Sampling
- One rough casting with the hardness survey in 35-50 days
- Lead time
- Pattern 25-35 days; first casting 45-60 days; series 30-40 days
- Packaging
- Vertical or horizontal crating on a steel skid with the lift plan and centre of gravity marked
- Shipping
- FOB Tianjin / Qingdao; heavy single pieces by flat-rack or break-bulk with our rigging plan
- If a batch fails
- Hardness, flatness and straightness against the survey; distortion from improper packing at site excluded
- Indicative price
- Quote only: price per kg follows weight, section, machining length, ground area and ageing method.
- Selling unit
- per kg