- MOQ
- MOQ 2 pcs per drawing; one stocked replacement rotor is accepted for breakdown orders.
- Sampling
- First-article rotor measured with the sealing bore and blade pitch recorded before the batch.
- Lead time
- 25-35 days after drawing approval; stocked sizes from 15 days.
- Packaging
- Oiled and wrapped, boxed with blades and parts, crate or carton with a packing list.
- Shipping
- FOB Tianjin / Qingdao; wet-duty rotors get extra rust protection for container transit.
- If a batch fails
- 12 months from B/L date against dimensional, material and sealing non-conformity.
- Indicative price
- Quote only: price follows rotor length, material grade, blade count and drive configuration.
- Selling unit
- per piece