- MOQ
- MOQ 2 pcs per drawing; a single replacement rotor for a breakdown is accepted when the model is stocked.
- Sampling
- A first-article rotor is machined, welded, measured and reported before the batch; balance certificate issued per rotor on request.
- Lead time
- 25-35 days after drawing approval.
- Packaging
- Shaft wrapped in oiled paper, flails and parts boxed, crate or carton per rotor with a loading plan.
- Shipping
- FOB Tianjin / Qingdao; assembled rotors are crate-lashed and heavy units move by container.
- If a batch fails
- 12 months from B/L date against dimensional, weld and balance non-conformity; breakage from overload is documented separately.
- Indicative price
- Quote only: price follows rotor length, material, drive type and whether the set includes flails and bearings.
- Selling unit
- per piece