Xingtai, Hebei · Hebei industrial clusters

Pumps & Valves · Cangzhou hydraulic cluster / Shijiazhuang valve trade

Heavy-Duty Slurry Pump, Metal-Lined Centrifugal, up to 300 m³/h

High-chromium metal-lined centrifugal slurry pump for abrasive transfer duty: flow and head named to your duty point with the wet-end grade and seal arrangement stated on the quote.

Heavy-Duty Slurry Pump, Metal-Lined Centrifugal, up to 300 m³/h manufactured in Hebei, China by VeraBOM & B2B Partner

Reference image — production units follow the approved drawing and the specification table below.

A slurry pump fails on wear, not on nameplate flow, so the wet-end material and the seal arrangement are the real specification. This is a horizontal centrifugal slurry pump with a high-chromium metal liner, built for abrasive slurries in mining, mineral processing, coal washing, power-plant ash handling and dredging.

Read the numbers as a set: flow up to 300 m³/h, head up to 60 m, speed 980 - 1,470 rpm selected against the duty point; wet end in Cr27 or Cr15Mo3 high-chromium alloy with renewable throat bush and backing liner; shaft seal by duty — gland packing with flush water, a mechanical seal for the lighter duties, or an expeller seal for the heavy ones. The casing is volute or split pattern to your preference and every pump is tested for flow, head, power and vibration against the named duty point before despatch.

Each pump carries a test sheet with the measured duty point and vibration record, and the liner and impeller drawings are supplied with the offer so a wear-life discussion starts from a drawing rather than a photograph. FOB Tianjin or Qingdao, crated on skids with the rotating assembly secured.

Specification

Technical parameters — the table we quote against

Send your requirement as a marked-up copy of this table and the quotation comes back line by line.

Heavy-Duty Slurry Pump, Metal-Lined Centrifugal, up to 300 m³/h — data sheet
TypeHorizontal centrifugal, metal-lined volute or split casing
FlowUp to 300 m³/h; lower flows sized from the same wet-end family
HeadUp to 60 m per stage
Speed980 - 1,470 rpm selected against the duty point
Wet endCr27 or Cr15Mo3 high-chromium alloy; rubber liner option for fine-particulate slurries
ImpellerClosed or semi-open high-chromium impeller, balanced to ISO 1940 G6.3
Shaft sealGland packing with flush water, mechanical seal, or expeller seal by duty
BearingSpherical roller bearings, oil or grease lubricated, temperature monitored
CasingCast iron or cast steel with renewable wear liners
TestingFlow, head, power and vibration measured against the named duty point
Export termsEXW / FOB / CIF, Tianjin or Qingdao

Engineering features

  • Wet-end alloy named on the offer, matched to the solids size and pH of your slurry
  • Renewable liners and impeller keep the pump repairable without a new casing
  • Bearing temperature and vibration points prepared for condition monitoring
  • Duty point tested and recorded before despatch, not assumed from the catalogue curve

Materials & grades

  • Cr27 / Cr15Mo3 high-chromium alloy
  • Cast iron / cast steel casing
  • Spherical roller bearings
  • Natural rubber liner option

Applications

  • Mining and mineral processing slurries
  • Coal washing and ash handling
  • Dredging and sand suction
  • Chemical and metallurgical process transfer

Heavy-Duty Slurry Pump, Metal-Lined Centrifugal, up to 300 m³/h: questions before you order

How do I size a slurry pump?

Send the duty: flow, total head, solids size and concentration, pH and temperature. The wet-end grade and the operating speed are then selected to that duty and the measured performance is recorded on the test sheet.

Metal liner or rubber liner?

High-chromium metal suits coarse and large solids; rubber suits fine abrasive slurries where a metal liner would wear on speed. We quote the honest choice for your solids description rather than a house preference.

Which shaft seal is right for my duty?

Gland packing with flush water is the workhorse for dirty water; an expeller seal removes the flush line on heavy slurries; a mechanical seal suits lighter duties and cleaner media. The choice is named on the quote once the duty is fixed.

What documentation comes with the pump?

Each pump ships with a test sheet recording flow, head, power and vibration at the named duty point; material certificates for the wet end are available where the project needs them.

Related categories in this shipment

Buyers of this item usually consolidate these as well — one container, one document pack, one inspection file.

Need a modification to this part?

More from this category

Other pumps & valves specifications

Comparing this part with another? The RFQ spec template puts both on one page, and the pre-shipment checklist is what we inspect against before the balance is paid.

Ask about this part — quantity, destination port, deviations

Request for quotation

Tell us what you need made or sourced

Send drawings, a photo or just a part name — we reply within 1 working day.

Only your name, your e-mail and the requirement — typed or recorded — are needed to send. Leave anything else blank and it comes back as a question in our reply instead of stopping you here.

Name, company and e-mail are the only required fields — nothing else blocks the enquiry.

Drawings are treated as confidential — tell us if you need an NDA first, and we will send one before you attach anything.

PDF, DWG, DXF, STEP, IGES, SLT, Office, CSV, PNG, JPG, ZIP or an audio recording — up to 4 files, 10 MB each.

We log the file list with your enquiry; the files themselves travel to the sales desk as mail attachments, not into a database record. Bigger than this? Send quote@verabom.com a link and we will pick it up.

By sending this form you agree we may contact you about this enquiry. We never resell your data — see our privacy policy.

Written first reply within 1 working day; priced answer within 2-5 working days.

Request a quotation for this part

Tell us quantity, destination port and any deviation from the data sheet above. We reply with a priced, dated quotation, the production route and the inspection plan.