A galvanised and powder-coated shelter frame with modular roof, toughened glass or PETG side panels, advertising cassette to standard poster sizes and a bench inside — quoted to a wind and roof load band with a drawn base.
Reference image — production units follow the approved drawing and the specification table below.
A bus shelter is a small structure, and it should be specified like one: post section and frame geometry, roof load and wind load band, glazing that is toughened and retained in a bead that can be replaced by a maintenance crew, and a base flange whose anchor pattern is drawn before the concrete is poured. Modular construction means the same post, beam and roof cassette covering the two-metre, three-metre and four-metre lengths, so a route can be fitted from one delivery with one spare-parts list.
Frames are fabricated from galvanised section and coated to the scheme colour, with the roof as a formed sheet or polycarbonate cassette on a purlin grid, gutters and downpipes where the design calls for them, and side panels in toughened glass 5 - 8 mm or PETG where vandalism weight matters. Advertising cassettes are quoted to the poster sizes your authority or media partner uses, with the opening mechanism and the lamp provision stated.
These ship knocked down: posts, beams, roof cassettes, glazing in crated frames and hardware in marked boxes, with the setting-out drawing and the fixings kit per unit. We quote the per-container count for the KD pack, the assembly sequence, and the crew time a scheme needs; a shelter ordered assembled is a freight decision that swallows the margin, and a shelter ordered without the anchor drawing is a site delay.