Is Sch 40 the same as an EN series tube, and does Sch 80 mean 80 bar?

Sch 80 is not 80 bar. In ASME B36.10M a schedule fixes a wall per size: Sch 40 on NPS 2 is 3.91 mm, Sch 80 on the same pipe 5.54 mm. At a larger size the same schedule number is a different thickness. EN and ISO practice names a tube by outside diameter with a wall from a dimension series, so the two naming systems do not translate.

Sch 80 is not 80 bar. In ASME B36.10M a schedule fixes a wall per size: Sch 40 on NPS 2 is 3.91 mm, Sch 80 on the same pipe 5.54 mm. At a larger size the same schedule number is a different thickness. EN and ISO practice names a tube by outside diameter with a wall from a dimension series, so the two naming systems do not translate.

Two confusions travel with the schedules. STD, XS and XXS (standard weight, extra strong, double extra strong) come from the older iron-number series and only line up with a schedule over part of the size range, so a substitution is checked size by size rather than from a chart. And DN is a nominal bore, not a measured dimension: DN 50 says nothing reliable about the outside diameter or the wall it arrives with.

Pressure capability is a calculation, not a label. The wall is checked against the allowable stress of the grade at design temperature, with the mill tolerance and a corrosion allowance, under the code the plant is built to - ASME B31.3 or B31.1 on one side, EN 13480 on the other. Mill tolerance belongs in that arithmetic: hot-finished tube standards allow a wall band around plus 15 % and minus 12.5 %, so the calculation must see the minimum.

What each designation names - the two millimetre figures shown are published B36.10M values for NPS 2 (2.375 in, 60.3 mm outside diameter); every other size is a different number
DesignationWhat it actually isOn NPS 2 / DN 50Away from that sizeThe trap
Sch 40a wall series number in ASME B36.10M, not a thickness3.91 mm on a 60.3 mm outside diametera different wall at every other nominal sizebeing read as a pressure class by half the market
Sch 80the heavier member of the same series5.54 mm on the same outside diameteragain size-dependentthe same misreading, plus a smaller bore and more mass
Sch 160heavier still, used where the calculation demands itmarkedly thicker on the same outside diameterthe series converges toward other names at the large sizesbend radius, threading and weight all change with it
STD wallfrom the iron-number seriescoincides with Sch 40 over part of the rangestops coinciding at the larger diametersassumed identical to Sch 40 across the whole size list
XS and XXSextra strong and double extra strongheavier than STD, commonly aligned with Sch 80 at small sizesonly partly aligned at the large sizesa drawing that says XS and a quotation that says Sch 80
EN and ISO dimension series (EN 10220, with the product standard governing tolerance)an outside diameter and wall pair, both written in millimetresa 60.3 mm tube with, say, a 3.2 mm wall is not the same part as 2 in Sch 40nothing scales; both figures are statedtreating an EN series number as a schedule equivalent
DN / NPS nominal designationa nominal size label, not a measured dimensionDN 50 and NPS 2 describe the same pipe familysays nothing about wall at allassuming the bore, the outside diameter and the wall follow from it

Values are the published minima, maxima or bands of the standards named in the table, taken at the stated thickness, size or temperature. Where a standard tabulates a value by size band, the value for your goods comes from the mill or test certificate, which we attach to the quotation instead of summarising it here.

Where this costs money

Three situations where the difference becomes a claim

Each is a decision taken at quotation stage, while the specification is still cheap to change.

A line rated by schedule instead of by calculation

The same Sch 40 wall carries very different pressures in still air, in steam at 250 °C and in a corrosive process, because the allowable stress of the grade falls with temperature and the corrosion allowance eats the margin. Where the pipe is pressure-retaining, the enquiry needs design pressure, design temperature, the medium and the code - and the wall then follows instead of being asserted.

Mixing wall series on one line

Fittings, threads and weld preparations follow the wall. A Sch 80 spool welded between Sch 40 runs needs a transition, a butt thread of the wrong wall damages the joint strength, and a socket or thread port sized for one series may be the wrong part for the other. The outside diameter matching is not the same statement as the bore and thread matching.

The mill tolerance consumed by the design

A nominal 6 mm wall with a minus 12.5 % tolerance can arrive near 5.3 mm, and a design that used the nominal figure has quietly lost margin - which is visible in the hydro test or later in service. Ask for measured wall on the batch by ultrasonic thickness gauge at the ends, record the lowest reading, and check the minimum against what the calculation assumed.

Questions buyers ask before they commit the specification

Which is thicker, Sch 40 or an EN series 2 tube?

The question has no answer until the outside diameter and both walls are on the table, because one system names a wall through a series number at a nominal size and the other writes outside diameter and wall in millimetres. Compare numbers directly: 2 in Sch 40 is 3.91 mm on 60.3 mm outside diameter, while a 60.3 by 3.2 tube is a lighter part with a lighter calculation behind it.

Can Sch 80 be used wherever the drawing says Sch 40?

Usually it is mechanically allowed and it is not free. The outside diameter is the same so the fittings still fit, but the bore is smaller, the mass is higher, the supports and the span calculation change, threading and bending behave differently, and the cost per metre rises. Where nothing else drives the choice it is a safe overspecification; where weight or flow matters it is a defect with extra paperwork.

Do stainless pipes use the same schedules?

They are listed in ASME B36.19M with S-suffix designations such as 10S, 40S and 80S, and thin-wall stainless in 10S is a common sight precisely because it is much lighter than a Sch 40 tube. Read the wall from the table for the actual size instead of assuming the carbon-steel figure transfers, and remember that a hygienic tube standard can use still different dimensions.

What should the enquiry state to avoid the mix-up?

Outside diameter and wall with their tolerance bands, the governing product standard and grade (EN 10210, EN 10216 or EN 10217 on the European side, ASTM A53 or A106 or API 5L on the American), the end preparation, and then the design pressure and temperature so the wall can be verified. If a schedule name is all you have, say so and ask for the millimetre figures back.

How do you inspect pipe and tube on receipt?

Outside diameter and wall measured against the standard and the declared tolerance band, on a sample per diameter and wall group, with ultrasonic thickness at the ends and the lowest reading recorded; plus the heat numbers against the EN 10204 3.1 certificate and the marking on the pipe itself. If a shipment cannot be traced to the certificate, it is treated as an unknown wall and the design check runs again.

Fit this to a real part

Send the drawing and the answer comes back with your numbers

The quotation for pipe fittings & flanges repeats this comparison against your grade, dimension, tolerance and test package, and names any deviation before production starts.

Ask about this specificationPipe Fittings & Flanges category hub

How we verify it

  • Grade and condition checked against the EN 10204 3.1 certificate and the heat marking.
  • Boundary dimensions, class, clearance or rating measured on the inspection sheet.
  • Deviations offered in writing before production, never discovered after shipment.

Trading and sourcing company based in northern Xingtai, Hebei, about 60 km south of the provincial capital. We buy across the industrial clusters of central and southern Hebei and reach the northern ones on scheduled factory runs; the supplier visits, benchmarking and pre-shipment inspection are ours, done in person. Not a factory. Multi-category, quoted from drawings, consolidated into one container and one document pack, and inspected before the balance is paid; every order starts as an RFQ.

Inspection and documents →

Written first reply within 1 working day; priced answer within 2-5 working days.

Quote it against your part, not the chart

Send the drawing, the standard your engineer named and the quantity. We reply with the priced specification, the substitution we recommend and why, and the inspection plan that proves it.