Xingtai, Hebei · Hebei industrial clusters

Data sheet · VeraBOM & B2B Partner · Hydraulic Cylinders

Aerial Work Platform Boom Cylinder, Ø100 mm × 1,400 mm, with Integrated Lock Valve

Second and third boom section cylinder for MEWPs: Ø100 mm bore, 20 MPa, cartridge counterbalance valve threaded into the port, two-stage telescoping compatible.

Reference
hc-boom-lift-cylinder-lock-valve
HS code
8412.2100 / 8412.2900
Sheet dated
16 September 2026
Issued by
VeraBOM & B2B Partner, Hebei, China

Technical parameters

Aerial Work Platform Boom Cylinder, Ø100 mm × 1,400 mm, with Integrated Lock Valve — data sheet
DutyBoom lift, single-acting with mechanical down-limit
BoreØ100 mm (Ø80 - Ø160 mm)
Stroke1,400 mm; closed length 1,010 mm
Rated pressure20 MPa; proof 30 MPa
RodØ70 mm hard chrome with induction-hardened eye bore
BarrelCold-drawn honed tube, welded trunnion base
SafetyIntegral cartridge counterbalance/lock valve, 3 bar cracking
SealingHeavy-duty wiper, NBR pressure seal, low-temperature option
PortsM22 × 1.5 threaded with cartridge cavity
MountingBase trunnion Ø50 mm, rod eye Ø40 mm with grease point
Testing1.5× proof, drop-hold test on the cartridge, cycle run
Test reportProof 1.5× rated pressure, leak and function test recorded per serial
Export termsEXW / FOB / CIF, Tianjin or Qingdao

Send your requirement as a marked-up copy of this table and the quotation comes back line by line.

Commercial terms

MOQ
MOQ 20 pcs per drawing; a single replacement cylinder is a valid order, but the economics only work from ten pieces per drawing.
Sampling
Prototype units are machined and tested with the drawing signed off first, and we send disassembly photographs plus the test sheet.
Lead time
25-35 days after drawing approval.
Packaging
Rod and port caps fitted, oil and VCI wrap, fumigated plywood crate or steel pallet with marked lashing points.
Shipping
FOB Tianjin / Qingdao standard; CIF or CFR quoted to your discharge port, flat-rack for strokes above 6 m.
If a batch fails
12 months from B/L date excluding seal wear parts; documented non-conformity replaced at our cost.
Indicative price
Quotation is depends on bore, stroke, seal brand and rod treatment; the quotation is itemised line by line.
Selling unit
per piece

Engineering features

  • Counterbalance cartridge fitted, set and leak-tested in the shop, not left to assembly
  • Eye bores and trunnions machined in one setup so the boom aligns without shimming on site
  • Spare cartridges, wipers and kits supplied against the same part number
  • Standard and acceptance criteria written into the order: EN 280 duty practice and ISO 6020-1 port pattern.
  • Grade substitution is documented, never assumed — Cold-drawn honed tube, Ck45 chrome rod, 42CrMo4 eyes are what we hold to.

Materials & grades

  • Cold-drawn honed tube
  • Ck45 chrome rod
  • 42CrMo4 eyes
  • NBR wiper

Applications

  • Mobile elevating work platforms
  • Cherry pickers and boom lifts
  • Truck-mounted cranes
  • Material handling booms