Data sheet · VeraBOM & B2B Partner · Pipe Fittings & Flanges
Blind Flange and Blanking Plate, A105 / 304, RF Face, 150-900 lb
Blind flanges and blanking plates in carbon and stainless steel, RF faces to class, for line isolation, test blanks and future tie-ins.
- Reference
- blind-flange-blanking-plate
- HS code
- 7307.1100 / 7307.2100 / 7307.9900 / 7308.9000
- Sheet dated
- 19 October 2026
- Issued by
- VeraBOM & B2B Partner, Hebei, China
Technical parameters
| Grade | A105 carbon; 304 / 316 stainless |
|---|---|
| Size | 1/2" - 24" (DN15 - DN600) |
| Pressure class | 150 - 900 lb |
| Face | RF standard; FF on request |
| Thickness | Held to the class standard |
| Bolt pattern | Drilled to the class bolt circle |
| Marking | Grade, heat and class marked on rim |
| Finish | Rust-preventive oil or painted |
| Documentation | Material certificate with heat number |
| Export terms | EXW / FOB / CIF, Tianjin or Qingdao |
Send your requirement as a marked-up copy of this table and the quotation comes back line by line.
Commercial terms
- MOQ
- 50 pcs per size and class; 5 pcs for maintenance blanks.
- Sampling
- Sample blind flange with report in 7-10 days.
- Lead time
- 15-25 days; stocked sizes ship within a week.
- Packaging
- Faces protected, palletised with separators, heat marked on the dunnage.
- Shipping
- FOB Tianjin / Qingdao; heavy pallets with lift notes.
- If a batch fails
- Dimensions, grade and heat per certificate; face damage documented on arrival.
- Indicative price
- Quote only: price follows grade, class, size, face finish and quantity.
- Selling unit
- per piece
Engineering features
- Face finish machined to the class, not left plate-finish
- Thickness and bolt pattern held to the standard
- Grade, heat and class marked on the rim
- Carbon and stainless families from one source
- Blanking plates rated and documented for test duty
Materials & grades
- A105
- 304 / 316 stainless
- RF / FF face
- Rust-preventive oil / paint
Applications
- Line isolation and test blanks
- Future tie-in ends
- Vessel and pump manways
- Temporary maintenance isolation