Data sheet · VeraBOM & B2B Partner · Street Furniture
Bin Liners, Ash Trays and Insert Consumables for Street Furniture
The consumable line that keeps a civic scheme serviceable: galvanised, HDPE and plastic liners, ash tray inserts, lock and hinge sets, slat spares and glazing beads, stocked against the models we ship.
- Reference
- litter-bin-liner-ash-tray-insert-consumables
- HS code
- 7326.9090 / 7308.9000 / 9401.8090 / 9406.9090
- Sheet dated
- 26 September 2026
- Issued by
- VeraBOM & B2B Partner, Hebei, China
Technical parameters
| Liners | Galvanised steel, HDPE and low-density plastic bag packs sized to the bin models shipped |
|---|---|
| Ash trays | Galvanised or stainless inserts, band-mounted and drop-in types, with the fixing stated |
| Locks and keys | Triangular, keyed and combination sets with a scheme keyway, spare cylinders and keys listed |
| Hinges and hardware | Door hinges, stays, catches, caps, feet and lifting handles by model |
| Slat spares | Hardwood and WPC slats cut, finished and pre-drilled to the bench profile |
| Shelter parts | Glazing beads, gaskets, cassette hinges, roof trims and lamp components |
| Bollard parts | Sockets, collars, caps, keys and reflective bands |
| Cross-reference | Part numbers keyed to the original order and printed on the packing list |
| Stocking | Held against the models shipped, with a first-stock allowance recommended per fleet size |
| Quantities | Mixed packs and pallet quantities; small air-freight consignments for urgent replacements |
| Material basis | Same coating systems as the parent item, so a spare does not fail sooner than what it replaces |
| Feedback loop | Failure rates reported back per item, which is how a slat or liner specification gets revised with evidence |
Send your requirement as a marked-up copy of this table and the quotation comes back line by line.
Commercial terms
- MOQ
- 100 - 500 pcs per part type; mixed consumable packs from 20 pcs per bin or bench model
- Sampling
- Fit-checked sample set in 5-10 days against the parent item drawing
- Lead time
- 10-20 days from the parts list; stock items for a known fleet ship in 5-8 days
- Packaging
- Boxed and palletised by part with the model code marked, mixed packs consolidated for a maintenance store
- Shipping
- FOB Tianjin / Qingdao, with air freight available for urgent small consignments
- If a batch fails
- Covered case by case: material and manufacturing defects; consumables by design with a replacement interval stated
- Indicative price
- Quote only: consumables price by part type, material, gauge and pack quantity, so we quote your fleet list and re-order cycle.
- Selling unit
- per pack
Engineering features
- Consumables matched to the models actually shipped rather than a generic range that nearly fits
- Part numbers cross-referenced to the original order, so a maintenance store can order from a photograph
- Mixed small lots with an air-freight route for the parts that stop a scheme looking maintained
- Failure data fed back into the parent specification, which is how a range improves between orders
Materials & grades
- Galvanised steel sheet
- HDPE and LDPE liners
- Stainless ash trays
- Hardwood and WPC slats
- EPDM gaskets and beads
Applications
- Municipal maintenance depots and streets crews
- Contractor-run public-realm maintenance
- Campus, hospital and business-park estates
- Transit authorities operating shelter and bin fleets