- MOQ
- 5 tonnes per grade/size; 1 tonne accepted for cut blanks on an existing heat
- Sampling
- Cut test coupons and a certificate pack for your welder qualification before the main order
- Lead time
- 10-20 days from mill slots; 25-30 days with class inspection or cutting programmes
- Packaging
- Bundled on steel skids with edge protectors, strapped in 3 bands per bundle, weather-proof banding
- Shipping
- FOB Tianjin; flat-rack or bulk for oversize lengths, and we supply the lift-point plan per bundle
- If a batch fails
- Chemistry and mechanical properties to the stated standard per 3.1 certificate; dimensional claims within 30 days of arrival
- Indicative price
- Quote only: tonne price is linked to the mill weekly plate index plus cutting length, grade and certificate level.
- Selling unit
- per tonne