- MOQ
- 5 tonnes per size, or 100 m for a mixed size order
- Sampling
- 1-2 m sample with certificates in 5 days from stock
- Lead time
- 12-25 days; mill-direct for uncommon sizes, 30-40 days for galvanised or heat-treated
- Packaging
- Six-legged wire bundles with rubber pads, ends capped, waterproof wrapping on ocean consignments
- Shipping
- FOB Tianjin / Qingdao; heavy-walled and long lengths shipped flat-rack with load plan
- If a batch fails
- Certificate-backed conformance; dimensional or straightness claims accepted within 30 days with photographs
- Indicative price
- Quote only: priced per tonne or metre against the pipe mill index, by size, schedule, test level and coating.
- Selling unit
- per metre