What does Ra 1.6 or N7 mean on a drawing, and how does it translate onto an American drawing?

The same height written three ways. Ra is the arithmetic mean profile deviation in micrometres, the ISO 1302 N grades are a ladder where each step doubles the last - N7 is Ra 1.6 µm, N8 is 3.2, N9 is 6.3 - and American drawings give the same target in micro-inches, where 1.6 µm is about 63 µin. Converting is arithmetic; deciding whether Ra is the right parameter is not.

The same height written three ways. Ra is the arithmetic mean profile deviation in micrometres, the ISO 1302 N grades are a ladder where each step doubles the last - N7 is Ra 1.6 µm, N8 is 3.2, N9 is 6.3 - and American drawings give the same target in micro-inches, where 1.6 µm is about 63 µin. Converting is arithmetic; deciding whether Ra is the right parameter is not.

Ra is a mean, and that is its weakness: it counts a peak and a deep isolated groove equally, says nothing about the direction of lay, and hides the bearing ratio a seal depends on. Rz, Rmax, the material-ratio curve and the skewness parameters describe different things, defined in EN ISO 4287 and carried further in the ISO 21920 series. A gasket seat, a rod land and a sliding bore should not all be specified with one Ra number.

The measurement is itself a specification item. Roughness is filtered, so the result depends on the cut-off wavelength chosen for the Ra range (ISO 4288 gives the sampling rules), on the stylus tip, and on how many readings were taken and where. A ground surface and a turned one can both report Ra 0.8 µm while one holds an oil film and the other wipes a seal dry.

The roughness ladder with its three names and what each level normally takes - conversion is exact, the process column is common practice rather than a standard
Ra (µm)N gradeRa (µin)Normally achieved bySpecified for
0.025N1about 1lapping, polishing, super-finishing to a near-mirrorgauge faces, master surfaces, sealed optical and bearing reference work
0.1N3about 4fine honing, super-finishing, high-grade grindingspindle journals, metering surfaces, sealing faces that must not leak past the peaks
0.4N5about 16cylindrical and surface grinding, fine boringbearing seats, hydraulic rod lands, high-cycle fillet surfaces
0.8N6about 32good turning and boring, grinding, fine millinglocating fits, seal grooves, machined faces that mate under load
1.6N7about 63milling, reaming, careful turningthe ordinary functional machined surface on a mechanical drawing
3.2N8about 125turning and milling as normal practicegeneral machining where nothing slides or seals on the surface
12.5N10about 490rough turning after a cut, sawn or sheared edges, dressed flame cutstructural faces, brackets, non-fit surfaces

Values are the published minima, maxima or bands of the standards named in the table, taken at the stated thickness, size or temperature. Where a standard tabulates a value by size band, the value for your goods comes from the mill or test certificate, which we attach to the quotation instead of summarising it here.

Where this costs money

Three situations where the difference becomes a claim

Each is a decision taken at quotation stage, while the specification is still cheap to change.

A sealing surface specified in Ra only

A low Ra can coexist with deep isolated grooves that leak, because a mean ignores the tails. Where a gasket, an O-ring or a fluid film depends on the surface, specify the valley depth or the material-ratio value alongside Ra, and say on which faces. Then measure those parameters - a profilist who only prints Ra cannot prove the requirement you wrote.

Micro-inches read as micrometres

A translated drawing asking for 32 µin that a shop works to 3.2 µm is a factor-of-ten miss in the wrong direction, and it passes inspection if nobody checks the units. The tidy conversion table (16, 32, 63, 125, 250 µin) exists precisely because the ladder is the same series scaled by 39.37, so write the unit on the drawing and repeat it on the inspection sheet.

Roughness asked for on a surface that will not survive assembly

A Ra 0.4 bore that is subsequently press-fitted, welded nearby, or handled with steel chamois stock is decorative. The usual fix is to specify the finish on the datum that matters, add the protection requirement, and place the fine surface where the tooling can actually reach it - a stylus needs access and a flat to sit on.

Questions buyers ask before they commit the specification

Is Ra the only roughness parameter?

Far from it. Amplitude parameters include Ra, Rz and Rmax, and the material-ratio curve gives bearing and retention behaviour; EN ISO 4287 defines them, with the ISO 21920 series taking the same subject further. There are also spacing and lay parameters, and waviness is a separate wavelength band again. Choose the parameter from the function, then set the tolerance - not the other way round.

Does a lower Ra number always mean better sliding?

No. A plateau-honed surface with a fine top and controlled valleys runs better than a uniformly polished one in some film-lubricated duties, and an extremely fine surface can increase adhesion and initiate judder. For running-in surfaces the direction of lay and the oil-retention texture matter as much as the mean height, which is why cross-hatch angles appear on engine drawings.

How should the symbol appear on the drawing?

To ISO 1302 (with EN ISO 1302 in current use): the parameter with its value, the surface direction or lay symbol if it matters, the machining allowance or the "material removal required" statement, and the evaluation conditions if they are not the defaults. Old drawings also carry the N-number form and the triangle symbols; both are still read in workshops, so state the modern form and keep the legacy marking in parentheses if the part travels.

How do you check roughness on receipt?

On the functional surface, with the stylus and cut-off recorded, several readings averaged and the highest and lowest kept - not one trace on the flattest corner of the part. We note the instrument, the cut-off length and the sampling length on the inspection sheet, because a claim of Ra 0.4 measured with a coarse cut-off is a different statement from the same number measured correctly.

Can a cast or flame-cut surface be N7?

Not as it comes. The N7 or Ra 1.6 target belongs to a machined skin, so the drawing has to say which faces are machined, how much stock exists to remove, and whether the finish applies before or after a machining operation. Cast skin with a decarburised or scaled layer under a fine finish is how a machined feature ends up with grinding-sand damage in the tool instead.

Fit this to a real part

Send the drawing and the answer comes back with your numbers

The quotation for machined & cnc custom parts repeats this comparison against your grade, dimension, tolerance and test package, and names any deviation before production starts.

Ask about this specificationMachined & CNC Custom Parts category hub

How we verify it

  • Grade and condition checked against the EN 10204 3.1 certificate and the heat marking.
  • Boundary dimensions, class, clearance or rating measured on the inspection sheet.
  • Deviations offered in writing before production, never discovered after shipment.

Trading and sourcing company based in northern Xingtai, Hebei, about 60 km south of the provincial capital. We buy across the industrial clusters of central and southern Hebei and reach the northern ones on scheduled factory runs; the supplier visits, benchmarking and pre-shipment inspection are ours, done in person. Not a factory. Multi-category, quoted from drawings, consolidated into one container and one document pack, and inspected before the balance is paid; every order starts as an RFQ.

Inspection and documents →

Written first reply within 1 working day; priced answer within 2-5 working days.

Quote it against your part, not the chart

Send the drawing, the standard your engineer named and the quantity. We reply with the priced specification, the substitution we recommend and why, and the inspection plan that proves it.