Xingtai, Hebei · Hebei industrial clusters

Data sheet · VeraBOM & B2B Partner · Pumps & Valves

Accumulator-Charged Hydraulic Unit for Test Rigs, Pulsation-Damped

Low-pulsation hydraulic supply with 10 L accumulator bank, servo-compatible filtration and cooling, sized for fatigue rigs and sustained load holding.

Reference
pv-accumulator-charged-test-rig-unit
HS code
8413.6090 / 8481.2000 / 8481.8040
Sheet dated
3 September 2026
Issued by
VeraBOM & B2B Partner, Hebei, China

Technical parameters

Accumulator-Charged Hydraulic Unit for Test Rigs, Pulsation-Damped — data sheet
ApplicationFatigue, proof and hold testing with load or pressure control
Supply15 L/min at 21 MPa from a 4 kW unit
Accumulation3 × 10 L bladder accumulators, pre-charge set to circuit
PulsationUnder 1.5 bar ripple at the test port with accumulators connected
Filtration6 µm absolute with online particle counter port
TemperatureWater-cooled with 3 °C control band
ControlLoad-sensing with proportional pressure control option
InstrumentationDigital pressure and temperature display, data logging port
SafetyAccumulator safety block, dump valve and pressure relief
MountingBench skid with forklift pockets and cable entry
TestingRipple and hold test recorded per unit before despatch
Bench testBench function, pressure and leak test with record per unit
Export termsEXW / FOB / CIF, Tianjin or Qingdao

Send your requirement as a marked-up copy of this table and the quotation comes back line by line.

Commercial terms

MOQ
MOQ 1 unit per specification; ten pieces for catalogue models and one piece for power units, valve blocks and engineered assemblies.
Sampling
Bench run-in with a video record and the measured flow, pressure and oil temperature at your settings.
Lead time
35-50 days.
Packaging
Ports plugged, flange faces guarded, unit crated or on a steel skid; hoses and fittings tagged per connection.
Shipping
FOB Tianjin / Qingdao; circuit packages consolidated as one shipment with a tagged packing list.
If a batch fails
12 months from B/L date, excluding wear parts and seals, subject to correct fluid cleanliness.
Indicative price
Quotation is depends on displacement, pressure class, cavity standard and actuation.
Selling unit
per piece

Engineering features

  • Accumulator volume and pre-charge calculated for your hold time and temperature band
  • Ripple measured at the test port and reported, not estimated
  • Ports and logging connections left accessible for your instrumentation
  • Standard and acceptance criteria written into the order: ISO 4413 and EN 14359 accumulator practice.
  • Grade substitution is documented, never assumed — Bladder accumulators, Stainless tubing, Anodised manifold are what we hold to.

Materials & grades

  • Bladder accumulators
  • Stainless tubing
  • Anodised manifold
  • Powder-coated skid

Applications

  • Component fatigue and proof testing
  • Seal and hose test benches
  • Cylinder run-in stations
  • Laboratory and university rigs