- MOQ
- MOQ 5 t per grade; 1 t cut-to-size trial.
- Sampling
- Cut sample with the hardness test in 3-5 days.
- Lead time
- 12-20 days after drawing and nesting approval.
- Packaging
- Plates bundled with edge protection, cut parts tagged and packed per the drawing list.
- Shipping
- FOB Tianjin / Qingdao; heavy plates loaded with a lifting and lashing plan.
- If a batch fails
- Covered case by case: hardness, dimension and material defect; cutting and welding practice assessed from the returned part.
- Indicative price
- Quote only: price by grade, thickness, cutting extent and quantity.
- Selling unit
- per tonne