Xingtai, Hebei · Hebei industrial clusters

Trade terms · Logistics · Incoterms

FOB, CIF and DDP on China Shipments: Where Risk Passes and Who Books What

Incoterms 2020 rule by rule for sea freight out of Tianjin: the on-board risk point, why FOB is the wrong term for a container, the insurance clause that CIF actually buys, and the DDP duty problem that shows up after arrival.

By VeraBOM & B2B Partner engineering & export team10 min read
FOB, CIF and DDP on China Shipments: Where Risk Passes and Who Books What — illustration

Eleven rules, four of which decide most China orders

Incoterms 2020, the ICC publication in force since 1 January 2020, contains eleven rules: EXW, FCA, CPT, CIP, DAP, DPU and DDP for any mode, plus FAS, FOB, CFR and CIF for sea and inland waterway only. The last four are the ones that get misused, because a container terminal is not a ship rail.

For an order leaving Tianjin or Qingdao, the practical choice set is FCA (named place, usually the factory or your consolidation warehouse), FOB (named port of shipment), CIF or CFR (named port of destination) and DDP (named place in your country). DPU — which replaced DAT in 2020 — is the only rule where the seller unloads, and it suits heavy project cargo such as prefab container houses or a complete production line delivered to a site with no forklift.

Note what Incoterms do not cover: they allocate cost, risk and the clearance obligations, and nothing else. Ownership, payment terms, warranty, liability for defect and force majeure all live in the sales contract. A well-chosen Incoterm cannot rescue a badly written one.

Where risk actually passes

Under FOB, risk transfers when the goods are placed on board the vessel at the named port of shipment. Under CFR and CIF, risk transfers at exactly the same point — the difference is only who pays freight and insurance. Buyers who assume CIF means the seller carries the risk to their door are wrong; the seller merely buys a policy on a risk that is already yours.

That is why the ICC recommends FCA or CIP for containerised cargo. In practice you deliver the container to a terminal, not onto a ship, and the goods sit in the carrier custody for days before loading. Under FOB those days are at buyer risk while the seller still controls the paperwork — an awkward gap that FCA closes by transferring risk at handover to the carrier at the named place.

Under DAP, DPU and DDP risk passes at the named destination, ready for unloading (and, for DPU, after unloading). If a container of hydraulic cylinders is damaged in transit on a DDP order, that is a seller problem; on a CIF order it is your claim against the underwriter, with the seller obliged only to hand over the documents needed to make it.

Who books the freight, and who insures it

Under EXW, FCA, FAS and FOB the buyer contracts the carriage; under CFR, CIF, CPT, CIP the seller does; under DAP, DPU and DDP the seller arranges everything to the named place. With FOB the buyer nominates the forwarder, which means the buyer also controls the sailing, the routing and the arrival date — useful when a production line is waiting.

Insurance is only mandatory under CIF and CIP. CIF requires the seller to obtain, as a minimum, cover on Institute Cargo Clauses (C), for 110% of the contract value, in the currency of the contract. ICC (C) is a named-perils clause: it excludes theft, pilferage, breakage, and does not respond to many container losses at all. The 2020 revision upgraded CIP to require ICC (A), all-risks cover, and left CIF at (C) — so an exporter quoting "CIF with full insurance" is often quoting something the rule does not require.

Ask for the clause in writing: "CIF (named port) Incoterms 2020 with Institute Cargo Clauses (A), 110% of invoice value, claims payable in the buyer currency, assignable to buyer." Then check the policy names the actual carrier, voyage and container number, and that the claims agent in your country is identified. Also note the verified gross mass requirement under SOLAS: the shipper declares it and an error there stops the container at the terminal, not at your dock.

DDP: the duty problem nobody prices properly

DDP means the seller delivers cleared for import, with duties, taxes and formalities paid, and acts as importer of record unless the parties agree otherwise. For that to be true, someone must hold an EORI number in the EU (or a GB EORI in the UK), be able to file the entry, and be able to reclaim or absorb the import VAT. Many Chinese exporters cannot, so DDP quotes are frequently delivered by a forwarder using a third-party importer of record — which puts your customs file in a name you do not control.

Classification drives the duty. Every line needs its own HS code at the eight or ten digit level, because the rate follows the code and not the product description: hydraulic cylinders sit in 8412, springs in 7320, rubber-insulated flexible cables in 8544, steel fasteners in 7318. Many industrial components into the EU land between zero and a few percent, but trade-defence measures change the picture completely — EU anti-dumping duties on certain Chinese iron and steel fasteners and on bicycles run into double digits, and US Section 301 and Section 232 measures add separate layers. Check TARIC or HTS for your exact code and the date of entry, not for the code someone used last year.

DDP also hides the recoverable part of the cost. If you are VAT-registered, import VAT paid under your own EORI is normally recoverable or can be postponed; paid by a third party under a DDP shipment, it is not yours to reclaim. That is why experienced importers of recurring industrial goods prefer DAP and clear the goods themselves, and reserve DDP for samples, spares and small parcels under the EUR 150 consignment threshold where IOSS applies.

First order versus recurring order

For a first order, control beats a cheap freight rate. Buy FCA at the factory or FOB at the port, with your own nominated forwarder, and pay 30% deposit with the balance against the inspection report before loading. You see the true ex-works cost, you choose the sailing, you receive the bill of lading in your own name, and if the goods fail inspection the container has not yet been booked in someone else service.

CIF is defensible for a first order when you have no forwarder and no volume to negotiate with: one number, one counterparty, and the seller handles the booking. The two conditions are a written destination charge schedule (some CIF forwarders recover margin through terminal handling and devanning charges billed to the consignee at destination) and ICC (A) cover rather than the minimum (C).

For a recurring order the calculus flips. Once three or four containers a year are moving, your own contract rates usually beat the freight element buried in a CIF quote, and FCA or FOB gives you consolidation freedom and a single set of shipping documents. Move to DDP only when you need a fixed landed cost to price against — a distributor selling at a list price, or a contractor with a fixed bid — and only after you have confirmed who the importer of record is and who reclaims the VAT.

Consolidation changes the answer

A container holding springs from Hengshui, machined parts from Cangzhou and cartons from Xiongxian is not one FOB shipment. FOB requires delivery on board at a named port, so quoting FOB forces every factory to arrange and pay inland carriage to Tianjin separately and to time its delivery to the same vessel. Quoting "FCA Hebei consolidation warehouse, Incoterms 2020" instead puts the inland collection in one pair of hands and gives you a single cut-off date.

Documents follow the same logic. One bill of lading covers the container; each seller issues its own commercial invoice, and the packing list is built per supplier then summarised for the container. Customs in your country normally wants each seller invoice, so a consolidator can only issue a single invoice if it is itself the seller of record to you — which changes who you claim against when something is wrong. Also check the valuation rule: consolidation and buying-agent fees that form part of the price paid or payable have to be declared.

Finally, mixed terms in one container break the risk analysis. If three suppliers are FOB and one is CIF with a different forwarder, you have two carriers, two insurance policies and two claims routes for a single load. Standardise on one term per shipment and one nominated party, and write it on every purchase order.

What to write on the purchase order

State the rule, the named place and the edition: "FCA Cangzhou factory, Incoterms 2020" or "CIF Hamburg, Incoterms 2020, Institute Cargo Clauses (A), 110% of invoice value". Without the edition and the named place the term is ambiguous, and ambiguity is resolved by whoever is holding the documents when the claim is filed.

Add the obligations you care about: export clearance and origin charges to the seller, verified gross mass declared by the shipper, inspection before loading with the balance payable against the passing report, free time at destination of not less than seven days, and the full document list with a deadline for drafts — typically three to five days before sailing so the entry can be lodged on arrival.

Then keep a record of which term each supplier is on and review it once a year. Freight rates move, consolidation volumes change, and a term that was right for a trial order is rarely right for the fourth repeat.

Questions this guide raises

Is FOB or CIF cheaper for a first container from China?

On the invoice, CIF often looks cheaper because the freight is bundled at a rate the exporter negotiated. In total cost they are usually close; the real difference is control. FOB or FCA gives you the sailing date, the bill of lading in your own name and a direct line to the carrier, which is worth more than a small freight saving on a first order.

Does CIF mean the seller insures my goods to my door?

No. Under CIF risk passes when the goods are on board at the port of shipment, and the seller only has to obtain minimum cover on Institute Cargo Clauses (C) for 110% of the contract value. Negotiate ICC (A) all-risks cover explicitly and make sure the policy is assignable to you.

Who is the importer of record under DDP?

The seller, unless the contract says otherwise — which means it needs an EORI number and the ability to file the entry and handle VAT in your country. Where the exporter cannot, a forwarder acts through a third-party importer of record, and you lose the ability to reclaim import VAT in your own name. Ask the question before accepting a DDP quotation.

Can we use one Incoterm for a consolidated multi-factory container?

Yes, and you should. FCA at a single consolidation point is the cleanest structure: each factory delivers there, one forwarder collects and books, one bill of lading covers the container, and each seller still issues its own commercial invoice for customs valuation.

Written first reply within 1 working day; priced answer within 2-5 working days.

Put this into practice on your next enquiry

Send drawings, a photo or just a part name — we reply within 1 working day.