Two categories, four document types
EN 10204:2004 splits inspection documents into non-specific and specific. Types 2.1 and 2.2 are non-specific: the results were not obtained on the products actually delivered to you. Types 3.1 and 3.2 are specific: inspection and testing were carried out on the delivered products, or on test units from the same manufacturing batch, and the results belong to your material.
A type 2.1 test report is a statement of compliance with the order and carries no test results at all. A type 2.2 test report carries results, but from products of the same manufacturing process rather than your own batch — the chemistry you are reading may come from a different melt that ran through the same mill the previous week.
A type 3.1 inspection certificate ties measured chemistry and mechanical results to the delivered items, and a type 3.2 adds a second signature from the purchaser or an independent third party. For anything you weld, machine into a pressure boundary or hang a load from, 3.1 is the floor and 3.2 is what a notified body or an EPC client will ask for.
Who signs, and why independence is the whole point
Under EN 10204 a 2.1 may be signed by the authorised representative of the manufacturer, who does not have to be independent of production. From 2.2 upward the signature must come from the authorised inspection representative of the manufacturer, who is independent of the manufacturing department. That separation is what you are paying for; a certificate signed by a production manager or a sales manager is a 2.1 wearing a 3.1 label.
Type 3.2 requires validation by a second party: the representative of the purchaser, the inspection body appointed by the purchaser, or the regulatory or notified body. Two signatures, two organisations, one heat number. Ask which organisation the second signatory works for and whether it is accredited to ISO/IEC 17020 or 17025.
Stockists and traders complicate this. A distributor that re-cuts a mill-tested plate cannot honestly issue a 3.1 for your cut pieces unless it holds the specific-inspection link and the marking; what it can do is pass on the original mill certificate with the heat number intact and state the re-cut traceability. Always demand the original mill document, not a summary someone retyped.
Melt traceability: the heat number has to reach the part
The join between paper and metal is the heat or melt number. Require three things that agree: the number marked on the product itself (paint stamp, hard stamp or tag per the marking clause of the product standard), the same number printed on the certificate, and the certificate naming your order number, product description, quantity, standard and grade. If any one of the three is missing, the traceability chain is broken and the certificate is decoration.
Check the values against the grade. S355J2 to EN 10025-2: C ≤ 0.24% for thickness up to 16 mm, Mn ≤ 1.60%, Si ≤ 0.55%, P and S ≤ 0.035%, CEV ≤ 0.45%, Rm 470-630 MPa, ReH ≥ 355 MPa, and 27 J Charpy V-notch at −20 °C per EN ISO 148-1. 42CrMo4 to EN 10083-3: C 0.38-0.45%, Cr 0.90-1.20%, Mo 0.15-0.30%. 316L to EN 10088: C ≤ 0.030%, Cr 16.5-18.5%, Ni 10.0-13.0%, Mo 2.00-2.50%. Those numbers are what a PMI reading is judged against.
Mechanical tests are run per EN ISO 6892-1 for tensile, EN ISO 148-1 for impact and EN ISO 6506-1 or 6508-1 for hardness, with sample positions taken per EN ISO 377 — longitudinal or transverse, and at quarter thickness for material above roughly 25 mm. Impact designations matter more than impact numbers: JR is 27 J at +20 °C, J0 at 0 °C, J2 at −20 °C, and K2 is 40 J at −20 °C. A certificate that reports impact energy without the test temperature has not told you anything.
What a fabricated certificate looks like
Real heats vary in the last decimal place. Five heats sharing identical chemistry values, or every result landing exactly on a specification limit, is a template rather than a laboratory. Look also for impossible combinations: S235 reporting Rm 700 MPa, a quenched and tempered bar reporting hardness the heat treatment cannot produce, or an analysis where the element totals do not make sense.
Then the administrative tells: certificate dated before the melt or the rolling order, dated before your purchase order, missing statement of specific inspection, no order number, signature block naming a person who works in sales, certificate numbers that break the sequence of the issuing register, and fonts or logos that do not match the mill published document format.
The cheapest control is physics. Run a handheld XRF or optical emission spectrometer over 10-20% of the lot before loading — Ni, Mo and Cr separate 304 from 316 from 321 in seconds, and only a spark OES unit can see carbon, which is what distinguishes 304 from 304L and 4130 from 4140. Where value or safety justifies it, cut a witness sample and send it to an ISO/IEC 17025 laboratory. Most mills will also confirm a certificate number by email when you ask directly, which costs nothing.
What to demand per product family
Steel plate, sections and pipe: 3.1 per heat with chemistry, tensile, impact at the service temperature, and ultrasonic testing of plate to EN 10307 or ASTM A578 where the part is thick or pressure-loaded. For pipe, add the NDT record per EN 10246 or ASTM A530 and the hydrostatic test record. Marking to EN 1025 / EN 10025 with the heat number legible after cutting.
Forgings, shafts and flanges: 3.1 plus volumetric NDT to EN 10228-3 or ASTM A388, surface MT or PT to EN 10228-1/-2 or ASTM E165, hardness survey across the batch, grain size to ASTM E112 for high-temperature duty, and PMI on every stainless and alloy lot. For lifting components the material certificate sits next to the proof-load record at twice the working load limit and the declaration of conformity to EN 1677 or EN 13414.
Fasteners: property-class test data to ISO 898-1 — proof load, wedge tensile, hardness, decarburisation and surface integrity — or ISO 3506 for stainless, with batch and heat traceability and head marking per the standard. Preloaded structural bolting to EN 14399 additionally needs the suitability class and k-factor certificate and evidence that the tightening system is calibrated. Castings: 3.1 with chemistry and mechanicals from a separately cast test bar per the applicable standard (EN 1563 for spheroidal graphite iron, where GJS-400-15 means Rm ≥ 400 MPa and A ≥ 15%), NDT to EN 12680 for ultrasonic, EN 12681 for radiographic and EN 1371 for magnetic particle and penetrant, plus a pressure test record.
Where 3.2 stops being optional: PED and third-party regimes
Under Pressure Equipment Directive 2014/68/EU, Annex I paragraph 4.1 requires materials for pressure parts to be accompanied by a certificate. For equipment in categories II, III and IV the material must come with a 3.1, and where the material is produced by someone other than the equipment manufacturer, that producer issues it. Category III and IV work, plus most notified-body witnessed activities, pushes you to 3.2 validated by the notified body.
Materials outside a harmonised European material standard need a Particular Material Appraisal under EN 764-5, agreed with the notified body before the order is placed. Getting this after the steel has been cut is expensive and slow, so it belongs in the enquiry.
Two families do not use EN 10204 at all and get mis-ordered because of it. Cables are certified by batch test records to EN 50525, a HAR certificate where the harmonised mark is claimed, and a declaration of performance under EN 50575 where the cable is permanently installed in a construction work. Corrugated packaging is certified by compression and edge-crush data to ISO 12048 and ISO 3037. Asking a cable factory for a 3.1 wastes a week; asking for the right document is free.
The clause to write into the purchase order
Something like: material certificates to EN 10204 type 3.1, specific inspection, per heat, signed by the authorised inspection representative independent of manufacturing; heat numbers hard-marked or paint-stamped on every item and listed on the packing list; certificates issued as PDF drafts before loading and as originals with the shipment; third-party witnessing by SGS, BV, Intertek or an equivalent body available at buyer option and quoted separately.
Add the verification right: PMI by XRF or OES on 100% of stainless and alloy lots before loading, with readings printed against the heat number on the packing list, and one witness sample per heat re-tested at an ISO/IEC 17025 laboratory at supplier cost if the results fall outside the specified grade. That sentence alone changes what arrives.
Finally, tie the certificates to the payment terms. Balance against inspection report and complete document pack — certificates, packing list, invoice, bill of lading, certificate of origin — means nobody has an incentive to ship first and invent paperwork later. Where the destination customs authority or the end client checks documents on arrival, the pack you assemble at loading is the only one you will ever get.
Questions this guide raises
Is a 2.2 certificate acceptable for structural steel?
For non-safety, non-welded general fabrication it is often accepted commercially, but it proves only that material from the same process met the grade — not your heat. Where the steel is welded into a load path, pressure part or lifting device, specify 3.1 and check that the heat number on the certificate matches the marking on the product.
Who pays for third-party witnessing of a 3.2 certificate?
It is a quoted line, not a default. Third-party inspection bodies charge by man-day plus travel, so the cost per certificate falls sharply when several heats or several suppliers are witnessed in one visit. Ask for the option price at quotation stage rather than after the material is produced.
Can we accept certificates stamped with the manufacturer mark instead of a paper pack?
Marking is required for traceability and is a good sign, but it is not a substitute for the certificate. The paper carries the measured chemistry and mechanical values; the stamp only proves the identity of the heat. Require both, and require the packing list to link each marked item to a certificate number.
Do you send certificates before shipment?
Yes. Drafts are emailed as soon as the mill closes the rolling or forging order, which gives you time to verify heat numbers and values against the grade before the goods are loaded, and lets the customs entry be prepared in parallel with the ocean voyage.